Chingford
CHILondonManaged by London Overground
How this station is performing
Chingford had 52,192 scheduled stops to Period 7 of 2026-27, about 143 a day. 96.4% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Chingford opened on 17 November 1873, 153 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ponders End is the oldest (1840) and Southbury the newest (1891), with Chingford in between.
The nearest stations to Chingford are Highams Park (2.7 km south), Ponders End (3.2 km west), Brimsdown (3.8 km north-west), Southbury (4.7 km west) and Meridian Water (4.8 km south-west). 50 stations lie within 10 km in all. Of the five, Meridian Water is the most punctual at 96.5% and Brimsdown the least at 86.4%, with Chingford on 96.4%.
Chingford is one of 2 stations named after an area of London called Chingford, home to about 70,583 people; this one stands 0.5 km from its centre.
Chingford is among the most punctual stations in Britain. Its 96.4% puts it 54th out of 2,374 ranked stations, with 53 ahead of it and 2,320 behind, and 12.5 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in London, Chingford is the most punctual, at 96.4%. The comparison group includes Acton Main Line (83.5%), Gunnersbury (84.8%) and Kew Gardens (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 52,192 | 96.4% | 1.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,028 | 97.2% | 1.0% |
| Period 6 of 2026-27 | 4,138 | 96.2% | 1.7% |
| Period 5 of 2026-27 | 4,100 | 96.2% | 1.3% |
| Period 4 of 2026-27 | 3,328 | 95.8% | 3.5% |
| Period 3 of 2026-27 | 4,122 | 96.4% | 2.0% |
| Period 2 of 2026-27 | 4,099 | 97.5% | 0.3% |
| Period 1 of 2026-27 | 4,699 | 96.7% | 2.0% |
| Period 13 of 2025-26 | 3,886 | 97.9% | 1.4% |
| Period 12 of 2025-26 | 4,120 | 95.9% | 1.3% |
| Period 11 of 2025-26 | 4,111 | 98.2% | 0.8% |
| Period 10 of 2025-26 | 3,348 | 96.4% | 1.3% |
| Period 9 of 2025-26 | 4,123 | 93.3% | 1.9% |
| Period 8 of 2025-26 | 4,090 | 95.5% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Acton Main Line | 52,180 | 83.5% | 4.2% |
| Gunnersbury | 52,255 | 84.8% | 9.3% |
| Kew Gardens | 52,255 | 85.0% | 9.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out