How this station is performing
Hampstead Heath had 101,751 scheduled stops to Period 7 of 2026-27, about 280 a day. 77.5% of recorded arrivals were within three minutes of the timetable and 8.2% of scheduled stops were cancelled.
Hampstead Heath opened on 2 January 1860, 166 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hampstead Heath is the oldest; the next oldest, Gospel Oak, dates from 1860.
The nearest stations to Hampstead Heath are Gospel Oak (1.0 km east), Finchley Road and Frognal (1.4 km south-west), Kentish Town West (1.6 km south-east), South Hampstead (1.8 km south-west) and Kentish Town (1.9 km east). 104 stations lie within 10 km in all. Of the five, South Hampstead is the most punctual at 92.6% and Finchley Road and Frognal the least at 75.2%, with Hampstead Heath on 77.5%.
Hampstead Heath is named after Hampstead, an area of London, home to about 48,858 people, but the station stands 0.6 km from its centre.
Compared with 3 stations of a similar size in London, Hampstead Heath is the least punctual, at 77.5%. All of them are ahead, including Brondesbury (77.8%), Kensal Rise (78.0%) and Brondesbury Park (78.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 101,751 | 77.5% | 8.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,301 | 80.8% | 5.7% |
| Period 6 of 2026-27 | 8,149 | 74.6% | 10.6% |
| Period 5 of 2026-27 | 8,154 | 79.1% | 17.1% |
| Period 4 of 2026-27 | 8,214 | 72.4% | 13.7% |
| Period 3 of 2026-27 | 7,135 | 74.5% | 7.8% |
| Period 2 of 2026-27 | 8,194 | 76.4% | 11.2% |
| Period 1 of 2026-27 | 9,443 | 82.2% | 3.9% |
| Period 13 of 2025-26 | 8,908 | 82.3% | 3.5% |
| Period 12 of 2025-26 | 7,618 | 79.8% | 5.2% |
| Period 11 of 2025-26 | 7,236 | 77.8% | 6.6% |
| Period 10 of 2025-26 | 5,293 | 77.3% | 6.9% |
| Period 9 of 2025-26 | 7,234 | 69.7% | 10.5% |
| Period 8 of 2025-26 | 7,872 | 76.8% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Brondesbury | 101,752 | 77.8% | 7.9% |
| Kensal Rise | 101,752 | 78.0% | 8.0% |
| Brondesbury Park | 101,753 | 78.3% | 7.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out