Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Dalston Junction

DLJLondonManaged by London Overground

On time, last 13 periods92.0%Great Britain: 83.6%
Cancelled4.1%Great Britain: 3.2%
Stops a day576Scheduled, on average
Punctuality rank362nd of 2,374Among ranked stations

How this station is performing

Dalston Junction had 209,638 scheduled stops to Period 7 of 2026-27, about 576 a day. 92.0% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.

Dalston Junction opened on 1 November 1865 and closed to passengers on 30 June 1986. It reopened on 23 May 2010, 16 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Hackney Central is the oldest (1850) and Dalston Kingsland the newest (1983), with Dalston Junction in between.

The nearest stations to Dalston Junction are Dalston Kingsland (0.3 km north), Haggerston (0.7 km south), Hackney Downs (1.1 km east), Hackney Central (1.3 km east) and London Fields (1.3 km east). 123 stations lie within 10 km in all. Of the five, London Fields is the most punctual at 93.3% and Hackney Central the least at 81.2%, with Dalston Junction on 92.0%.

Dalston Junction is named after Dalston, an area of London, but the station stands 0.3 km from its centre.

Compared with 3 stations of a similar size in London, Dalston Junction is the most punctual, at 92.0%. The comparison group includes Haggerston (91.4%), Hoxton (91.9%) and Rotherhithe (91.1%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 95.4%Period 2 of 2023-24: 93.3%Period 3 of 2023-24: 93.0%Period 4 of 2023-24: 92.4%Period 5 of 2023-24: 94.1%Period 6 of 2023-24: 94.0%Period 7 of 2023-24: 90.8%Period 8 of 2023-24: 92.6%Period 9 of 2023-24: 89.6%Period 10 of 2023-24: 90.3%Period 11 of 2023-24: 91.2%Period 12 of 2023-24: 91.7%Period 13 of 2023-24: 93.7%Period 1 of 2024-25: 93.0%Period 2 of 2024-25: 93.8%Period 3 of 2024-25: 95.0%Period 4 of 2024-25: 94.1%Period 5 of 2024-25: 96.2%Period 6 of 2024-25: 95.2%Period 7 of 2024-25: 94.4%Period 8 of 2024-25: 93.8%Period 9 of 2024-25: 92.0%Period 10 of 2024-25: 94.2%Period 11 of 2024-25: 92.2%Period 12 of 2024-25: 94.2%Period 13 of 2024-25: 94.5%Period 1 of 2025-26: 95.0%Period 2 of 2025-26: 93.6%Period 3 of 2025-26: 93.1%Period 4 of 2025-26: 93.8%Period 5 of 2025-26: 96.0%Period 6 of 2025-26: 93.8%Period 7 of 2025-26: 92.3%Period 8 of 2025-26: 92.6%Period 9 of 2025-26: 91.6%Period 10 of 2025-26: 93.4%Period 11 of 2025-26: 91.6%Period 12 of 2025-26: 93.7%Period 13 of 2025-26: 94.2%Period 1 of 2026-27: 92.8%Period 2 of 2026-27: 92.6%Period 3 of 2026-27: 92.3%Period 4 of 2026-27: 92.2%Period 5 of 2026-27: 90.4%Period 6 of 2026-27: 88.3%Period 7 of 2026-27: 89.5%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 1.3%Period 2 of 2023-24: 1.4%Period 3 of 2023-24: 1.4%Period 4 of 2023-24: 2.5%Period 5 of 2023-24: 1.3%Period 6 of 2023-24: 2.0%Period 7 of 2023-24: 1.7%Period 8 of 2023-24: 1.7%Period 9 of 2023-24: 2.4%Period 10 of 2023-24: 2.6%Period 11 of 2023-24: 2.7%Period 12 of 2023-24: 1.4%Period 13 of 2023-24: 1.2%Period 1 of 2024-25: 2.5%Period 2 of 2024-25: 1.3%Period 3 of 2024-25: 1.5%Period 4 of 2024-25: 1.7%Period 5 of 2024-25: 1.8%Period 6 of 2024-25: 1.3%Period 7 of 2024-25: 2.9%Period 8 of 2024-25: 2.4%Period 9 of 2024-25: 3.7%Period 10 of 2024-25: 1.8%Period 11 of 2024-25: 1.6%Period 12 of 2024-25: 1.3%Period 13 of 2024-25: 2.7%Period 1 of 2025-26: 2.0%Period 2 of 2025-26: 1.6%Period 3 of 2025-26: 4.2%Period 4 of 2025-26: 2.7%Period 5 of 2025-26: 3.2%Period 6 of 2025-26: 2.0%Period 7 of 2025-26: 1.9%Period 8 of 2025-26: 2.8%Period 9 of 2025-26: 3.1%Period 10 of 2025-26: 2.2%Period 11 of 2025-26: 3.1%Period 12 of 2025-26: 3.0%Period 13 of 2025-26: 2.9%Period 1 of 2026-27: 3.7%Period 2 of 2026-27: 4.2%Period 3 of 2026-27: 3.3%Period 4 of 2026-27: 5.7%Period 5 of 2026-27: 11.0%Period 6 of 2026-27: 5.5%Period 7 of 2026-27: 2.9%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
London Overground209,63892.0%4.1%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2716,19489.5%2.9%
Period 6 of 2026-2715,45388.3%5.5%
Period 5 of 2026-2715,59790.4%11.0%
Period 4 of 2026-2716,08992.2%5.7%
Period 3 of 2026-2716,34092.3%3.3%
Period 2 of 2026-2715,85592.6%4.2%
Period 1 of 2026-2718,73992.8%3.7%
Period 13 of 2025-2616,62994.2%2.9%
Period 12 of 2025-2616,12093.7%3.0%
Period 11 of 2025-2616,25991.6%3.1%
Period 10 of 2025-2614,48193.4%2.2%
Period 9 of 2025-2616,09391.6%3.1%
Period 8 of 2025-2615,78992.6%2.8%

Time of year

80%90%100%P1: 94.0%1P2: 93.3%2P3: 93.3%3P4: 93.1%4P5: 94.2%5P6: 92.9%6P7: 91.8%7P8: 93.0%8P9: 91.1%9P10: 92.8%10P11: 91.7%11P12: 93.2%12P13: 94.2%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
Haggerston209,63491.4%3.9%
Hoxton209,63491.9%3.9%
Rotherhithe209,63491.1%3.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out