Kensal Rise
KNRLondonManaged by London Overground
How this station is performing
Kensal Rise had 101,752 scheduled stops to Period 7 of 2026-27, about 280 a day. 78.0% of recorded arrivals were within three minutes of the timetable and 8.0% of scheduled stops were cancelled.
Kensal Rise opened on 1 November 1861. It was moved to the site it uses now on 1 July 1873. Among the 5 stations nearest to it with a known opening date, Brondesbury is the oldest (1860) and Kensal Green the newest (1916), with Kensal Rise in between.
The nearest stations to Kensal Rise are Kensal Green (0.5 km south-west), Brondesbury Park (1.0 km north-east), Queens Park (London) (1.1 km east), Willesden Junction (1.6 km west) and Brondesbury (1.7 km north-east). 95 stations lie within 10 km in all. Of the five, Queens Park (London) is the most punctual at 92.4% and Brondesbury the least at 77.8%, with Kensal Rise on 78.0%.
Kensal Rise takes its name from an area of London called Kensal Rise, and the station stands 0.3 km from its centre.
1 of 3 stations of a similar size in London are more punctual than Kensal Rise on 78.0%. The comparison group includes Brondesbury (77.8%), Brondesbury Park (78.3%) and Finchley Road and Frognal (75.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 101,752 | 78.0% | 8.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,302 | 82.0% | 5.5% |
| Period 6 of 2026-27 | 8,149 | 75.4% | 10.5% |
| Period 5 of 2026-27 | 8,154 | 79.7% | 17.2% |
| Period 4 of 2026-27 | 8,213 | 72.7% | 13.7% |
| Period 3 of 2026-27 | 7,135 | 75.5% | 7.6% |
| Period 2 of 2026-27 | 8,194 | 77.3% | 11.0% |
| Period 1 of 2026-27 | 9,443 | 82.5% | 3.8% |
| Period 13 of 2025-26 | 8,908 | 83.4% | 3.3% |
| Period 12 of 2025-26 | 7,619 | 80.3% | 5.0% |
| Period 11 of 2025-26 | 7,236 | 78.1% | 6.4% |
| Period 10 of 2025-26 | 5,293 | 77.0% | 6.7% |
| Period 9 of 2025-26 | 7,234 | 69.4% | 9.9% |
| Period 8 of 2025-26 | 7,872 | 77.3% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Brondesbury | 101,752 | 77.8% | 7.9% |
| Brondesbury Park | 101,753 | 78.3% | 7.9% |
| Finchley Road and Frognal | 101,753 | 75.2% | 8.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out