Romford
RMFLondonManaged by Elizabeth line
How this station is performing
Romford had 161,709 scheduled stops to Period 7 of 2026-27, about 444 a day. 90.3% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Romford opened on 20 June 1839, 187 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Romford is the oldest; the next oldest, Chadwell Heath, dates from 1864.
The nearest stations to Romford are Gidea Park (1.8 km north-east), Emerson Park (2.7 km east), Chadwell Heath (3.8 km west), Harold Wood (4.1 km north-east) and Goodmayes (5.0 km west). 17 stations lie within 10 km in all. At 90.3%, Romford is more punctual than every one of them; the best of the five, Goodmayes, manages 88.6%.
Romford takes its name from an area of London called Romford, and the station stands 0.3 km from its centre.
3 operators call at Romford: Elizabeth line (88.8%, 74% of stops), London Overground (99.7%, 14% of stops) and Greater Anglia (88.2%, 13% of stops). The operator you travel with matters: London Overground reaches 99.7% within three minutes while Greater Anglia manages 88.2%, a gap of 11.5 percentage points.
1 of 3 stations of a similar size in London are more punctual than Romford on 90.3%. The comparison group includes Willesden Junction (86.2%), Barking (92.4%) and Lewisham (87.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 118,884 | 88.8% | 2.3% |
| London Overground | 22,220 | 99.7% | 0.4% |
| Greater Anglia | 20,605 | 88.2% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Romford? Delay Repay
These operators call at Romford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 12,727 | 91.0% | 1.5% |
| Period 6 of 2026-27 | 12,487 | 86.7% | 2.0% |
| Period 5 of 2026-27 | 12,274 | 88.0% | 4.0% |
| Period 4 of 2026-27 | 12,566 | 89.3% | 2.6% |
| Period 3 of 2026-27 | 12,667 | 89.2% | 2.6% |
| Period 2 of 2026-27 | 12,588 | 91.8% | 1.4% |
| Period 1 of 2026-27 | 14,537 | 91.9% | 1.7% |
| Period 13 of 2025-26 | 11,123 | 89.6% | 3.4% |
| Period 12 of 2025-26 | 12,668 | 93.7% | 0.5% |
| Period 11 of 2025-26 | 12,469 | 91.6% | 1.1% |
| Period 10 of 2025-26 | 11,391 | 92.7% | 1.3% |
| Period 9 of 2025-26 | 12,129 | 89.3% | 1.4% |
| Period 8 of 2025-26 | 12,083 | 88.4% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Willesden Junction | 160,851 | 86.2% | 6.4% |
| Barking | 156,374 | 92.4% | 2.5% |
| Lewisham | 168,171 | 87.0% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out