Tottenham Court Road
TCRLondonManaged by London Underground
How this station is performing
Tottenham Court Road had 226,897 scheduled stops to Period 7 of 2026-27, about 623 a day. 92.1% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Tottenham Court Road opened on 24 May 2022, 4 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Tottenham Court Road is the newest; the oldest, London Euston, opened in 1837.
The nearest stations to Tottenham Court Road are Bond Street (1.0 km west), London Charing Cross (1.1 km south-east), London Euston (1.5 km north), London Waterloo (1.9 km south-east) and London St Pancras International (2.0 km north). 128 stations lie within 10 km in all. Of the five, Bond Street is the most punctual at 92.2% and London Euston the least at 72.4%, with Tottenham Court Road on 92.1%.
Across the whole run of data, the weakest four-week period for Tottenham Court Road was Period 9 of 2023-24, at 88.1%, some time before the latest year. The strongest was Period 8 of 2024-25, at 95.6%, and the two are 7.5 percentage points apart. Cancellations peaked at 8.9% of scheduled stops in Period 5 of 2023-24, against 2.6% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Tottenham Court Road on 92.1%. The comparison group includes Bond Street (92.2%), London Euston (72.4%) and Canonbury (86.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 226,897 | 92.1% | 2.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 17,606 | 93.1% | 2.0% |
| Period 6 of 2026-27 | 16,905 | 91.3% | 3.2% |
| Period 5 of 2026-27 | 17,608 | 89.1% | 5.2% |
| Period 4 of 2026-27 | 17,467 | 92.5% | 2.2% |
| Period 3 of 2026-27 | 16,928 | 90.2% | 2.4% |
| Period 2 of 2026-27 | 17,415 | 93.3% | 2.7% |
| Period 1 of 2026-27 | 20,066 | 92.8% | 2.7% |
| Period 13 of 2025-26 | 18,594 | 93.2% | 2.2% |
| Period 12 of 2025-26 | 17,452 | 93.8% | 0.9% |
| Period 11 of 2025-26 | 17,608 | 91.9% | 3.0% |
| Period 10 of 2025-26 | 15,718 | 94.2% | 2.0% |
| Period 9 of 2025-26 | 16,210 | 90.8% | 2.5% |
| Period 8 of 2025-26 | 17,320 | 91.0% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bond Street | 226,896 | 92.2% | 2.6% |
| London Euston | 231,225 | 72.4% | 4.8% |
| Canonbury | 215,814 | 86.0% | 6.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out