Bond Street
BDSLondonManaged by London Underground
How this station is performing
Bond Street had 226,896 scheduled stops to Period 7 of 2026-27, about 623 a day. 92.2% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Bond Street opened on 24 October 2022, 4 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bond Street is the newest; the oldest, London Euston, opened in 1837.
The nearest stations to Bond Street are Tottenham Court Road (1.0 km east), London Marylebone (1.7 km north-west), London Charing Cross (1.8 km south-east), London Euston (1.9 km north-east) and London Victoria (2.1 km south). 125 stations lie within 10 km in all. At 92.2%, Bond Street is more punctual than every one of them; the best of the five, Tottenham Court Road, manages 92.1%.
Across the whole run of data, the weakest four-week period for Bond Street was Period 9 of 2023-24, at 88.2%, some time before the latest year. The strongest was Period 8 of 2024-25, at 95.9%, and the two are 7.7 percentage points apart. Cancellations peaked at 8.9% of scheduled stops in Period 5 of 2023-24, against 2.6% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Bond Street is the most punctual, at 92.2%. The comparison group includes Tottenham Court Road (92.1%), London Euston (72.4%) and Canonbury (86.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 226,896 | 92.2% | 2.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 17,606 | 92.8% | 2.1% |
| Period 6 of 2026-27 | 16,905 | 91.0% | 3.2% |
| Period 5 of 2026-27 | 17,608 | 88.9% | 5.2% |
| Period 4 of 2026-27 | 17,467 | 92.5% | 2.1% |
| Period 3 of 2026-27 | 16,928 | 89.9% | 2.3% |
| Period 2 of 2026-27 | 17,415 | 93.3% | 2.6% |
| Period 1 of 2026-27 | 20,066 | 93.1% | 2.7% |
| Period 13 of 2025-26 | 18,594 | 93.5% | 2.1% |
| Period 12 of 2025-26 | 17,452 | 94.2% | 0.9% |
| Period 11 of 2025-26 | 17,607 | 92.4% | 2.9% |
| Period 10 of 2025-26 | 15,718 | 94.6% | 1.9% |
| Period 9 of 2025-26 | 16,210 | 91.3% | 2.5% |
| Period 8 of 2025-26 | 17,320 | 91.4% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tottenham Court Road | 226,897 | 92.1% | 2.6% |
| London Euston | 231,225 | 72.4% | 4.8% |
| Canonbury | 215,814 | 86.0% | 6.9% |