Iver
IVRSouth EastManaged by Elizabeth line
How this station is performing
Iver had 36,304 scheduled stops to Period 7 of 2026-27, about 100 a day. 83.9% of recorded arrivals were within three minutes of the timetable and 4.7% of scheduled stops were cancelled.
Iver opened on 1 December 1924, 102 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, West Drayton is the oldest (1838) and Heathrow Terminal 5 (Rail Station Only) the newest (2008), with Iver in between.
The nearest stations to Iver are West Drayton (2.4 km east), Langley (Berks) (2.4 km west), Heathrow Terminal 5 (Rail Station Only) (4.2 km south), Heathrow Terminals 2 and 3 (Rail Station Only) (5.4 km south-east) and Sunnymeads (5.6 km south-west). 23 stations lie within 10 km in all. At 83.9%, Iver is less punctual than all of them; the best of the five, Heathrow Terminal 5 (Rail Station Only), manages 91.2%.
Iver takes its name from a Village called Iver, home to about 11,688 people, and the station stands 1.3 km from its centre.
2 operators call at Iver: Elizabeth line (84.0%, 98% of stops) and Great Western Railway (80.0%, 2% of stops). They are close together, with Elizabeth line leading on 84.0% and Great Western Railway trailing on 80.0%, a gap of 4.0 percentage points.
Compared with 3 stations of a similar size in South East, Iver is the most punctual, at 83.9%. The comparison group includes Godalming (79.0%), Swanwick (77.5%) and Haslemere (75.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 35,710 | 84.0% | 4.7% |
| Great Western Railway | 594 | 80.0% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Iver? Delay Repay
These operators call at Iver and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,799 | 82.3% | 3.6% |
| Period 6 of 2026-27 | 2,570 | 83.6% | 4.9% |
| Period 5 of 2026-27 | 2,799 | 83.1% | 7.8% |
| Period 4 of 2026-27 | 2,794 | 86.9% | 3.2% |
| Period 3 of 2026-27 | 2,739 | 84.2% | 5.8% |
| Period 2 of 2026-27 | 2,750 | 87.2% | 5.1% |
| Period 1 of 2026-27 | 3,159 | 85.8% | 5.6% |
| Period 13 of 2025-26 | 3,086 | 86.8% | 2.5% |
| Period 12 of 2025-26 | 2,799 | 84.1% | 3.5% |
| Period 11 of 2025-26 | 2,784 | 85.0% | 6.1% |
| Period 10 of 2025-26 | 2,420 | 80.1% | 4.6% |
| Period 9 of 2025-26 | 2,801 | 79.3% | 4.2% |
| Period 8 of 2025-26 | 2,804 | 80.7% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out