Twyford
TWYSouth EastManaged by Great Western Railway
How this station is performing
Twyford had 83,960 scheduled stops to Period 7 of 2026-27, about 231 a day. 85.3% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Twyford opened on 1 July 1839, 187 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Twyford is the oldest; the next oldest, Shiplake, dates from 1857.
The nearest stations to Twyford are Wargrave (2.7 km north), Shiplake (4.2 km north), Winnersh Triangle (4.7 km south-west), Winnersh (5.1 km south) and Earley (5.4 km south-west). 9 stations lie within 10 km in all. At 85.3%, Twyford is less punctual than all of them; the best of the five, Wargrave, manages 98.0%.
Twyford is one of 9 stations named after a Village called Twyford, home to about 6,952 people; this one stands 0.3 km from its centre.
2 operators call at Twyford: Great Western Railway (86.9%, 61% of stops) and Elizabeth line (82.7%, 39% of stops). They are close together, with Great Western Railway leading on 86.9% and Elizabeth line trailing on 82.7%, a gap of 4.2 percentage points.
1 of 3 stations of a similar size in South East are more punctual than Twyford on 85.3%. The comparison group includes Staines (88.7%), Didcot Parkway (70.8%) and Oxford (76.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 51,537 | 86.9% | 3.2% |
| Elizabeth line | 32,423 | 82.7% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Twyford? Delay Repay
These operators call at Twyford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,529 | 84.9% | 2.8% |
| Period 6 of 2026-27 | 5,800 | 83.8% | 4.3% |
| Period 5 of 2026-27 | 6,409 | 83.4% | 5.4% |
| Period 4 of 2026-27 | 6,255 | 84.7% | 2.4% |
| Period 3 of 2026-27 | 6,226 | 86.7% | 4.7% |
| Period 2 of 2026-27 | 6,389 | 87.0% | 3.0% |
| Period 1 of 2026-27 | 7,455 | 86.9% | 3.8% |
| Period 13 of 2025-26 | 7,179 | 87.8% | 1.9% |
| Period 12 of 2025-26 | 6,532 | 85.7% | 2.6% |
| Period 11 of 2025-26 | 6,538 | 87.0% | 4.4% |
| Period 10 of 2025-26 | 5,587 | 84.3% | 3.5% |
| Period 9 of 2025-26 | 6,531 | 82.1% | 3.1% |
| Period 8 of 2025-26 | 6,530 | 83.5% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Staines | 80,459 | 88.7% | 2.1% |
| Didcot Parkway | 88,376 | 70.8% | 3.4% |
| Oxford | 88,564 | 76.0% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out