Abbey Wood
ABWLondonManaged by Elizabeth line
How this station is performing
Abbey Wood had 192,600 scheduled stops to Period 7 of 2026-27, about 529 a day. 93.0% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Abbey Wood opened on 30 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Abbey Wood is the oldest; the next oldest, Belvedere, dates from 1859.
The nearest stations to Abbey Wood are Belvedere (2.3 km east), Plumstead (2.5 km west), Welling (3.1 km south-west), Bexleyheath (3.2 km south) and Barking Riverside (3.2 km north). 46 stations lie within 10 km in all. Of the five, Barking Riverside is the most punctual at 96.7% and Bexleyheath the least at 84.1%, with Abbey Wood on 93.0%.
Abbey Wood takes its name from an area of London called Abbey Wood, home to about 17,700 people, and the station stands 0.8 km from its centre.
3 operators call at Abbey Wood: Elizabeth line (94.9%, 59% of stops), Southeastern (92.0%, 29% of stops) and GTR (86.0%, 12% of stops). The operator you travel with matters: Elizabeth line reaches 94.9% within three minutes while GTR manages 86.0%, a gap of 8.9 percentage points.
Compared with 3 stations of a similar size in London, Abbey Wood is the most punctual, at 93.0%. The comparison group includes London Waterloo East (85.8%), London Charing Cross (84.9%) and Wimbledon (82.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 113,999 | 94.9% | 2.5% |
| Southeastern | 56,258 | 92.0% | 1.6% |
| GTR | 22,343 | 86.0% | 6.4% |
Operators with their own page for this station are linked to it.
Late train at Abbey Wood? Delay Repay
These operators call at Abbey Wood and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 15,079 | 93.3% | 2.2% |
| Period 6 of 2026-27 | 14,852 | 92.6% | 2.8% |
| Period 5 of 2026-27 | 14,473 | 92.1% | 4.0% |
| Period 4 of 2026-27 | 14,928 | 92.7% | 1.7% |
| Period 3 of 2026-27 | 13,700 | 91.1% | 2.9% |
| Period 2 of 2026-27 | 14,773 | 93.0% | 3.1% |
| Period 1 of 2026-27 | 17,019 | 93.8% | 2.6% |
| Period 13 of 2025-26 | 16,406 | 93.0% | 1.4% |
| Period 12 of 2025-26 | 14,263 | 93.7% | 1.8% |
| Period 11 of 2025-26 | 14,811 | 94.0% | 3.5% |
| Period 10 of 2025-26 | 13,355 | 95.2% | 2.5% |
| Period 9 of 2025-26 | 14,358 | 92.2% | 2.9% |
| Period 8 of 2025-26 | 14,583 | 92.8% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Waterloo East | 201,786 | 85.8% | 2.4% |
| London Charing Cross | 201,825 | 84.9% | 2.4% |
| Wimbledon | 204,294 | 82.8% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out