Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Ealing Broadway

EALLondonManaged by Elizabeth line

On time, last 13 periods82.9%Great Britain: 83.6%
Cancelled4.3%Great Britain: 3.2%
Stops a day366Scheduled, on average
Punctuality rank1265th of 2,374Among ranked stations

How this station is performing

Ealing Broadway had 133,358 scheduled stops to Period 7 of 2026-27, about 366 a day. 82.9% of recorded arrivals were within three minutes of the timetable and 4.3% of scheduled stops were cancelled.

Ealing Broadway opened on 17 December 1838, 188 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ealing Broadway is the oldest; the next oldest, Hanwell, dates from 1838.

The nearest stations to Ealing Broadway are West Ealing (1.4 km west), Drayton Green (2.0 km west), Acton Main Line (2.3 km east), Castle Bar Park (2.3 km north-west) and Hanwell (2.6 km west). 64 stations lie within 10 km in all. At 82.9%, Ealing Broadway is less punctual than all of them; the best of the five, Castle Bar Park, manages 96.8%.

Ealing Broadway is named after Ealing, an area of London, home to about 85,014 people, but the station stands 0.6 km from its centre.

3 operators call at Ealing Broadway: Elizabeth line (82.9%, 98% of stops), Great Western Railway (84.2%, 2% of stops) and Heathrow Express (–, 0% of stops). They are close together, with Great Western Railway leading on 84.2% and Elizabeth line trailing on 82.9%, a gap of 1.3 percentage points.

2 of 3 stations of a similar size in London are more punctual than Ealing Broadway on 82.9%. The comparison group includes Orpington (80.2%), Hackney Downs (92.3%) and Heathrow Terminals 2 and 3 (Rail Station Only) (87.9%).

Period by period

70%75%80%85%90%2023-242024-252025-262026-27Period 1 of 2023-24: 81.3%Period 2 of 2023-24: 82.3%Period 3 of 2023-24: 83.4%Period 4 of 2023-24: 85.4%Period 5 of 2023-24: 84.7%Period 6 of 2023-24: 83.4%Period 7 of 2023-24: 84.4%Period 8 of 2023-24: 77.5%Period 9 of 2023-24: 73.0%Period 10 of 2023-24: 81.1%Period 11 of 2023-24: 81.1%Period 12 of 2023-24: 86.5%Period 13 of 2023-24: 85.5%Period 1 of 2024-25: 82.5%Period 2 of 2024-25: 85.0%Period 3 of 2024-25: 86.6%Period 4 of 2024-25: 84.6%Period 5 of 2024-25: 83.9%Period 6 of 2024-25: 86.6%Period 7 of 2024-25: 81.7%Period 8 of 2024-25: 85.2%Period 9 of 2024-25: 73.7%Period 10 of 2024-25: 87.3%Period 11 of 2024-25: 79.2%Period 12 of 2024-25: 78.5%Period 13 of 2024-25: 83.0%Period 1 of 2025-26: 83.9%Period 2 of 2025-26: 85.5%Period 3 of 2025-26: 87.9%Period 4 of 2025-26: 85.2%Period 5 of 2025-26: 89.0%Period 6 of 2025-26: 83.1%Period 7 of 2025-26: 79.6%Period 8 of 2025-26: 78.6%Period 9 of 2025-26: 79.3%Period 10 of 2025-26: 84.3%Period 11 of 2025-26: 84.3%Period 12 of 2025-26: 82.5%Period 13 of 2025-26: 83.7%Period 1 of 2026-27: 83.6%Period 2 of 2026-27: 83.7%Period 3 of 2026-27: 82.4%Period 4 of 2026-27: 84.7%Period 5 of 2026-27: 82.9%Period 6 of 2026-27: 83.5%Period 7 of 2026-27: 84.5%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 3.5%Period 2 of 2023-24: 3.2%Period 3 of 2023-24: 3.4%Period 4 of 2023-24: 3.2%Period 5 of 2023-24: 8.4%Period 6 of 2023-24: 5.0%Period 7 of 2023-24: 2.6%Period 8 of 2023-24: 5.2%Period 9 of 2023-24: 7.0%Period 10 of 2023-24: 4.8%Period 11 of 2023-24: 4.0%Period 12 of 2023-24: 2.9%Period 13 of 2023-24: 3.9%Period 1 of 2024-25: 1.8%Period 2 of 2024-25: 3.0%Period 3 of 2024-25: 3.3%Period 4 of 2024-25: 5.4%Period 5 of 2024-25: 5.5%Period 6 of 2024-25: 3.9%Period 7 of 2024-25: 2.4%Period 8 of 2024-25: 1.6%Period 9 of 2024-25: 7.5%Period 10 of 2024-25: 2.7%Period 11 of 2024-25: 7.8%Period 12 of 2024-25: 4.6%Period 13 of 2024-25: 3.5%Period 1 of 2025-26: 2.7%Period 2 of 2025-26: 2.9%Period 3 of 2025-26: 3.3%Period 4 of 2025-26: 2.4%Period 5 of 2025-26: 2.9%Period 6 of 2025-26: 2.8%Period 7 of 2025-26: 4.0%Period 8 of 2025-26: 4.1%Period 9 of 2025-26: 3.4%Period 10 of 2025-26: 3.4%Period 11 of 2025-26: 5.5%Period 12 of 2025-26: 2.8%Period 13 of 2025-26: 2.0%Period 1 of 2026-27: 4.7%Period 2 of 2026-27: 4.5%Period 3 of 2026-27: 4.7%Period 4 of 2026-27: 2.6%Period 5 of 2026-27: 9.8%Period 6 of 2026-27: 4.2%Period 7 of 2026-27: 3.6%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Elizabeth line130,21182.9%4.3%
Great Western Railway3,14684.2%3.4%
Heathrow Express1––

Operators with their own page for this station are linked to it.

Late train at Ealing Broadway? Delay Repay

These operators call at Ealing Broadway and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2710,27384.5%3.6%
Period 6 of 2026-279,55683.5%4.2%
Period 5 of 2026-2710,38382.9%9.8%
Period 4 of 2026-2710,31884.7%2.6%
Period 3 of 2026-279,99482.4%4.7%
Period 2 of 2026-2710,25483.7%4.5%
Period 1 of 2026-2711,51083.6%4.7%
Period 13 of 2025-2611,13183.7%2.0%
Period 12 of 2025-2610,21682.5%2.8%
Period 11 of 2025-2610,18584.3%5.5%
Period 10 of 2025-269,47384.3%3.4%
Period 9 of 2025-269,97779.3%3.4%
Period 8 of 2025-2610,08878.6%4.1%

Time of year

70%75%80%85%90%P1: 82.8%1P2: 84.1%2P3: 85.1%3P4: 85.0%4P5: 85.2%5P6: 84.2%6P7: 82.6%7P8: 80.4%8P9: 75.4%9P10: 84.2%10P11: 81.6%11P12: 82.6%12P13: 84.0%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
Orpington133,03580.2%1.9%
Hackney Downs133,82292.3%2.1%
Heathrow Terminals 2 and 3 (Rail Station Only)131,84287.9%5.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out