Taplow
TAPSouth EastManaged by Elizabeth line
How this station is performing
Taplow had 34,577 scheduled stops to Period 7 of 2026-27, about 95 a day. 82.7% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Taplow opened on 4 June 1838. It was moved to the site it uses now on 1 September 1872. Of the 5 stations nearest to it with a known opening date, Taplow is the oldest; the next oldest, Maidenhead, dates from 1854.
The nearest stations to Taplow are Burnham (Buckinghamshire) (2.4 km east), Maidenhead (2.9 km west), Furze Platt (3.4 km west), Cookham (4.7 km north-west) and Bourne End (6.3 km north). 11 stations lie within 10 km in all. At 82.7%, Taplow is less punctual than all of them; the best of the five, Bourne End, manages 92.6%.
Taplow takes its name from a Village called Taplow, home to about 2,390 people, and the station stands 1.0 km from its centre.
Across the whole run of data, the weakest four-week period for Taplow was Period 9 of 2024-25, at 72.9%, some time before the latest year. The strongest was Period 5 of 2025-26, at 89.4%, and the two are 16.5 percentage points apart. Cancellations peaked at 8.0% of scheduled stops in Period 11 of 2024-25, against 3.7% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Taplow on 82.7%. The comparison group includes Farnborough (Main) (79.6%), Woolston (80.7%) and Aylesbury (90.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 34,078 | 83.1% | 3.7% |
| Great Western Railway | 499 | – | – |
Operators with their own page for this station are linked to it.
Late train at Taplow? Delay Repay
These operators call at Taplow and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,674 | 81.9% | 4.4% |
| Period 6 of 2026-27 | 2,449 | 80.5% | 4.0% |
| Period 5 of 2026-27 | 2,677 | 81.1% | 5.9% |
| Period 4 of 2026-27 | 2,656 | 84.7% | 1.7% |
| Period 3 of 2026-27 | 2,601 | 83.4% | 4.8% |
| Period 2 of 2026-27 | 2,616 | 84.8% | 2.4% |
| Period 1 of 2026-27 | 3,015 | 84.2% | 4.9% |
| Period 13 of 2025-26 | 2,947 | 86.0% | 2.2% |
| Period 12 of 2025-26 | 2,618 | 82.7% | 2.7% |
| Period 11 of 2025-26 | 2,661 | 84.4% | 4.7% |
| Period 10 of 2025-26 | 2,309 | 81.1% | 3.4% |
| Period 9 of 2025-26 | 2,674 | 79.2% | 3.2% |
| Period 8 of 2025-26 | 2,680 | 80.3% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Farnborough (Main) | 34,594 | 79.6% | 3.2% |
| Woolston | 34,540 | 80.7% | 5.4% |
| Aylesbury | 35,091 | 90.1% | 1.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out