Whitechapel
ZLWLondonManaged by London Underground
How this station is performing
Whitechapel had 436,497 scheduled stops to Period 7 of 2026-27, about 1199 a day. 91.0% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Whitechapel opened on 10 April 1876 and closed to passengers on 23 December 2007. It reopened on 23 May 2010, 16 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Whitechapel is the newest; the oldest, Bethnal Green, opened in 1872.
The nearest stations to Whitechapel are Bethnal Green (0.5 km north), Shadwell (1.0 km south), Shoreditch High Street (1.1 km west), Cambridge Heath (1.4 km north) and London Liverpool Street (1.5 km west). 134 stations lie within 10 km in all. Of the five, Cambridge Heath is the most punctual at 93.2% and Bethnal Green the least at 90.8%, with Whitechapel on 91.0%.
Whitechapel is one of 2 stations named after an area of London called Whitechapel; this one stands 0.7 km from its centre.
2 operators call at Whitechapel: Elizabeth line (92.2%, 52% of stops) and London Overground (89.8%, 48% of stops). They are close together, with Elizabeth line leading on 92.2% and London Overground trailing on 89.8%, a gap of 2.4 percentage points.
Compared with 3 stations of a similar size in London, Whitechapel is the most punctual, at 91.0%. The comparison group includes London Waterloo (82.0%), London Paddington (84.2%) and Farringdon (86.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 226,864 | 92.2% | 2.6% |
| London Overground | 209,633 | 89.8% | 3.7% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 33,798 | 89.8% | 2.3% |
| Period 6 of 2026-27 | 32,352 | 88.7% | 4.1% |
| Period 5 of 2026-27 | 33,200 | 89.0% | 7.5% |
| Period 4 of 2026-27 | 33,554 | 91.1% | 3.6% |
| Period 3 of 2026-27 | 33,265 | 90.1% | 2.5% |
| Period 2 of 2026-27 | 33,266 | 92.2% | 3.4% |
| Period 1 of 2026-27 | 38,802 | 92.2% | 3.0% |
| Period 13 of 2025-26 | 35,217 | 93.0% | 2.4% |
| Period 12 of 2025-26 | 33,572 | 93.2% | 1.8% |
| Period 11 of 2025-26 | 33,866 | 91.2% | 2.8% |
| Period 10 of 2025-26 | 30,199 | 93.0% | 1.9% |
| Period 9 of 2025-26 | 32,301 | 89.4% | 2.6% |
| Period 8 of 2025-26 | 33,105 | 90.2% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Waterloo | 426,216 | 82.0% | 2.5% |
| London Paddington | 420,545 | 84.2% | 3.5% |
| Farringdon | 400,839 | 86.9% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out