Tonbridge
TONSouth EastManaged by Southeastern
How this station is performing
Tonbridge had 89,026 scheduled stops to Period 7 of 2026-27, about 245 a day. 76.2% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Tonbridge opened on 26 May 1842, 184 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Tonbridge is the oldest; the next oldest, Penshurst, dates from 1842.
The nearest stations to Tonbridge are Hildenborough (3.9 km north-west), Leigh (Kent) (4.1 km west), High Brooms (4.7 km south), Penshurst (6.8 km west) and Tunbridge Wells (6.8 km south). 8 stations lie within 10 km in all. Of the five, Penshurst is the most punctual at 88.7% and Hildenborough the least at 70.3%, with Tonbridge on 76.2%.
Tonbridge takes its name from a market town called Tonbridge, home to about 38,657 people, and the station stands 0.6 km from its centre.
2 operators call at Tonbridge: Southeastern (74.3%, 82% of stops) and GTR (84.7%, 18% of stops). The operator you travel with matters: GTR reaches 84.7% within three minutes while Southeastern manages 74.3%, a gap of 10.4 percentage points.
1 of 3 stations of a similar size in South East are more punctual than Tonbridge on 76.2%. The comparison group includes Oxford (76.0%), Didcot Parkway (70.8%) and Chatham (79.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 73,402 | 74.3% | 1.5% |
| GTR | 15,624 | 84.7% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Tonbridge? Delay Repay
These operators call at Tonbridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,720 | 59.2% | 1.6% |
| Period 6 of 2026-27 | 6,770 | 60.5% | 1.4% |
| Period 5 of 2026-27 | 6,863 | 74.0% | 2.5% |
| Period 4 of 2026-27 | 6,873 | 82.1% | 1.1% |
| Period 3 of 2026-27 | 6,912 | 79.4% | 1.7% |
| Period 2 of 2026-27 | 6,617 | 82.5% | 1.5% |
| Period 1 of 2026-27 | 7,761 | 84.7% | 1.1% |
| Period 13 of 2025-26 | 7,547 | 81.5% | 1.3% |
| Period 12 of 2025-26 | 6,942 | 82.5% | 1.0% |
| Period 11 of 2025-26 | 6,661 | 80.5% | 1.2% |
| Period 10 of 2025-26 | 5,512 | 76.5% | 1.8% |
| Period 9 of 2025-26 | 6,903 | 71.0% | 2.3% |
| Period 8 of 2025-26 | 6,945 | 73.6% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Oxford | 88,564 | 76.0% | 3.9% |
| Didcot Parkway | 88,376 | 70.8% | 3.4% |
| Chatham | 91,440 | 79.3% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out