CrossCountry at Oxford
How this operator is doing here
CrossCountry had 16,607 scheduled stops at Oxford in the 13 periods to Period 7 of 2026-27, 19% of the station's total. 59.0% of recorded arrivals came within three minutes and 5.4% of stops were cancelled.
CrossCountry trains at Oxford also serve Didcot Parkway (15.9 km south, 89.7% on time, 3.4% cancelled), Banbury (34.4 km north, 53.1% on time, 5.0% cancelled), Reading (38.7 km south-east, 60.3% on time, 5.7% cancelled), Bramley (Hampshire) (49.3 km south, – on time, – cancelled), Basingstoke (55.4 km south, 57.8% on time, 3.8% cancelled) and Overton (55.5 km south, – on time, – cancelled), which are the stations on its network closest to Oxford.
The busiest CrossCountry station within 30 km of Oxford is Didcot Parkway, 15.9 km south, with about 1 scheduled stops a day.
Of the 3 operators with enough records at Oxford, CrossCountry is the least punctual, at 59.0%.
For CrossCountry, Oxford is the 69th best of 99 ranked stations. Its 59.0% here is 4.2 percentage points below the 63.2% across the whole network.
CrossCountry at Oxford has slipped sharply. 59.0% of stops came within three minutes of the timetable in the latest 13 periods, 7.8 percentage points worse than the 66.8% recorded in the 13 before. Cancellations rose to 5.4% of scheduled stops from 4.4%, which is 1.0 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,404 | 54.6% | 6.6% |
| Period 6 of 2026-27 | 1,422 | 48.1% | 7.0% |
| Period 5 of 2026-27 | 1,402 | 47.7% | 5.8% |
| Period 4 of 2026-27 | 1,398 | 47.9% | 5.8% |
| Period 3 of 2026-27 | 1,328 | 59.5% | 5.3% |
| Period 2 of 2026-27 | 1,308 | 61.0% | 8.3% |
| Period 1 of 2026-27 | 1,460 | 64.8% | 2.5% |
| Period 13 of 2025-26 | 1,378 | 70.4% | 3.0% |
| Period 12 of 2025-26 | 930 | 73.0% | 6.1% |
| Period 11 of 2025-26 | 1,269 | 69.6% | 4.3% |
| Period 10 of 2025-26 | 1,099 | 65.8% | 8.6% |
| Period 9 of 2025-26 | 1,096 | 51.1% | 4.6% |
| Period 8 of 2025-26 | 1,113 | 58.9% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Oxford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 45,435 | 72.1% | 4.6% |
| Chiltern Railways | 26,522 | 92.5% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out