Didcot Parkway
DIDSouth EastManaged by Great Western Railway
How this station is performing
Didcot Parkway had 88,376 scheduled stops to Period 7 of 2026-27, about 243 a day. 70.8% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Didcot Parkway opened on 12 June 1844, 182 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Cholsey is the oldest (1840) and Radley the newest (1856), with Didcot Parkway in between.
The nearest stations to Didcot Parkway are Appleford (3.1 km north), Culham (4.7 km north), Cholsey (7.4 km south-east), Radley (8.3 km north) and Goring and Streatley (12.5 km south-east). 4 stations lie within 10 km in all. At 70.8%, Didcot Parkway is less punctual than all of them; the best of the five, Goring and Streatley, manages 80.5%.
Didcot Parkway is a parkway station, 0.6 km from the centre of Didcot, a town, home to about 32,186 people, which gives it its name.
2 operators call at Didcot Parkway: Great Western Railway (70.8%, 100% of stops) and CrossCountry (89.7%, 0% of stops). The operator you travel with matters: CrossCountry reaches 89.7% within three minutes while Great Western Railway manages 70.8%, a gap of 18.9 percentage points.
Compared with 3 stations of a similar size in South East, Didcot Parkway is the least punctual, at 70.8%. All of them are ahead, including Oxford (76.0%), Tonbridge (76.2%) and Chatham (79.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 88,100 | 70.8% | 3.4% |
| CrossCountry | 276 | 89.7% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Didcot Parkway? Delay Repay
These operators call at Didcot Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,666 | 70.1% | 4.0% |
| Period 6 of 2026-27 | 6,687 | 67.2% | 4.0% |
| Period 5 of 2026-27 | 6,742 | 64.4% | 5.8% |
| Period 4 of 2026-27 | 6,801 | 64.9% | 3.8% |
| Period 3 of 2026-27 | 6,756 | 70.1% | 4.4% |
| Period 2 of 2026-27 | 6,828 | 72.2% | 2.6% |
| Period 1 of 2026-27 | 7,835 | 76.9% | 2.7% |
| Period 13 of 2025-26 | 7,461 | 77.4% | 2.2% |
| Period 12 of 2025-26 | 6,689 | 79.7% | 1.8% |
| Period 11 of 2025-26 | 6,381 | 75.6% | 2.9% |
| Period 10 of 2025-26 | 5,897 | 71.1% | 3.7% |
| Period 9 of 2025-26 | 6,800 | 63.4% | 3.2% |
| Period 8 of 2025-26 | 6,833 | 66.3% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out