Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Great Western Railway at Oxford

All trains at OxfordGreat Western Railway across BritainSouth East

On time, last 13 periods72.1%Whole station: 76.0%
Cancelled4.6%Whole station: 3.9%
Scheduled stops45,435Of 88,564 at the station

How this operator is doing here

Great Western Railway had 45,435 scheduled stops at Oxford in the 13 periods to Period 7 of 2026-27, 51% of the station's total. 72.1% of recorded arrivals came within three minutes and 4.6% of stops were cancelled.

Great Western Railway trains at Oxford also serve Radley (7.8 km south, 71.1% on time, 4.5% cancelled), Hanborough (10.6 km north-west, 60.5% on time, 4.5% cancelled), Culham (11.3 km south, 73.3% on time, 4.6% cancelled), Combe (Oxon) (12.2 km north-west, – on time, – cancelled), Appleford (12.8 km south, 76.1% on time, 4.5% cancelled) and Tackley (14.3 km north, 75.8% on time, 2.2% cancelled), which are the stations on its network closest to Oxford.

Within 30 km of here, Great Western Railway runs best at Goring and Streatley, 27.5 km south (80.5%), and worst at Kingham, 29.7 km north-west (56.7%).

The busiest Great Western Railway station within 30 km of Oxford is Didcot Parkway, 15.9 km south, with about 242 scheduled stops a day.

Great Western Railway at Oxford has slipped sharply. 72.1% of stops came within three minutes of the timetable in the latest 13 periods, 5.8 percentage points worse than the 77.9% recorded in the 13 before. Cancellations rose to 4.6% of scheduled stops from 3.8%, which is 0.8 percentage points more.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 71.9%Period 2 of 2023-24: 83.0%Period 3 of 2023-24: 73.4%Period 4 of 2023-24: 74.2%Period 5 of 2023-24: 70.2%Period 6 of 2023-24: 73.9%Period 7 of 2023-24: 77.4%Period 8 of 2023-24: 71.7%Period 9 of 2023-24: 67.4%Period 10 of 2023-24: 74.1%Period 11 of 2023-24: 73.7%Period 12 of 2023-24: 77.5%Period 13 of 2023-24: 77.5%Period 1 of 2024-25: 84.3%Period 2 of 2024-25: 77.8%Period 3 of 2024-25: 79.9%Period 4 of 2024-25: 74.9%Period 5 of 2024-25: 77.9%Period 6 of 2024-25: 78.7%Period 7 of 2024-25: 76.4%Period 8 of 2024-25: 75.2%Period 9 of 2024-25: 66.9%Period 10 of 2024-25: 82.2%Period 11 of 2024-25: 81.0%Period 12 of 2024-25: 82.2%Period 13 of 2024-25: 80.9%Period 1 of 2025-26: 82.1%Period 2 of 2025-26: 83.0%Period 3 of 2025-26: 79.5%Period 4 of 2025-26: 76.1%Period 5 of 2025-26: 76.7%Period 6 of 2025-26: 74.5%Period 7 of 2025-26: 72.9%Period 8 of 2025-26: 68.9%Period 9 of 2025-26: 65.4%Period 10 of 2025-26: 73.4%Period 11 of 2025-26: 78.9%Period 12 of 2025-26: 80.8%Period 13 of 2025-26: 81.1%Period 1 of 2026-27: 76.4%Period 2 of 2026-27: 72.1%Period 3 of 2026-27: 70.7%Period 4 of 2026-27: 64.5%Period 5 of 2026-27: 66.9%Period 6 of 2026-27: 67.7%Period 7 of 2026-27: 71.8%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 6.7%Period 2 of 2023-24: 2.7%Period 3 of 2023-24: 5.0%Period 4 of 2023-24: 2.7%Period 5 of 2023-24: 3.6%Period 6 of 2023-24: 3.2%Period 7 of 2023-24: 2.7%Period 8 of 2023-24: 3.2%Period 9 of 2023-24: 5.8%Period 10 of 2023-24: 9.1%Period 11 of 2023-24: 5.3%Period 12 of 2023-24: 4.2%Period 13 of 2023-24: 3.2%Period 1 of 2024-25: 2.9%Period 2 of 2024-25: 4.3%Period 3 of 2024-25: 3.9%Period 4 of 2024-25: 4.3%Period 5 of 2024-25: 3.4%Period 6 of 2024-25: 2.9%Period 7 of 2024-25: 2.3%Period 8 of 2024-25: 3.7%Period 9 of 2024-25: 6.4%Period 10 of 2024-25: 4.7%Period 11 of 2024-25: 2.6%Period 12 of 2024-25: 2.4%Period 13 of 2024-25: 4.0%Period 1 of 2025-26: 2.8%Period 2 of 2025-26: 1.7%Period 3 of 2025-26: 4.3%Period 4 of 2025-26: 5.0%Period 5 of 2025-26: 3.4%Period 6 of 2025-26: 5.8%Period 7 of 2025-26: 3.0%Period 8 of 2025-26: 4.0%Period 9 of 2025-26: 4.6%Period 10 of 2025-26: 4.6%Period 11 of 2025-26: 3.2%Period 12 of 2025-26: 3.0%Period 13 of 2025-26: 2.3%Period 1 of 2026-27: 4.3%Period 2 of 2026-27: 3.5%Period 3 of 2026-27: 5.9%Period 4 of 2026-27: 5.5%Period 5 of 2026-27: 8.8%Period 6 of 2026-27: 4.6%Period 7 of 2026-27: 5.1%2023-242024-252025-262026-27

See how Great Western Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-273,72371.8%5.1%
Period 6 of 2026-273,75367.7%4.6%
Period 5 of 2026-273,69666.9%8.8%
Period 4 of 2026-273,62064.5%5.5%
Period 3 of 2026-273,61770.7%5.9%
Period 2 of 2026-273,54672.1%3.5%
Period 1 of 2026-273,87276.4%4.3%
Period 13 of 2025-263,67981.1%2.3%
Period 12 of 2025-262,88780.8%3.0%
Period 11 of 2025-263,34178.9%3.2%
Period 10 of 2025-263,04673.4%4.6%
Period 9 of 2025-263,30765.4%4.6%
Period 8 of 2025-263,34868.9%4.0%

Time of year

60%70%80%90%P1: 79.4%1P2: 78.3%2P3: 75.9%3P4: 72.4%4P5: 73.0%5P6: 73.6%6P7: 74.6%7P8: 71.9%8P9: 66.6%9P10: 76.6%10P11: 77.9%11P12: 80.2%12P13: 79.9%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Oxford

OperatorScheduled stopsWithin 3 minCancelled
Chiltern Railways26,52292.5%1.6%
CrossCountry16,60759.0%5.4%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out