Great Western Railway had 45,435 scheduled stops at Oxford in the 13 periods to Period 7 of 2026-27, 51% of the station's total. 72.1% of recorded arrivals came within three minutes and 4.6% of stops were cancelled.
Great Western Railway trains at Oxford also serve Radley (7.8 km south, 71.1% on time, 4.5% cancelled), Hanborough (10.6 km north-west, 60.5% on time, 4.5% cancelled), Culham (11.3 km south, 73.3% on time, 4.6% cancelled), Combe (Oxon) (12.2 km north-west, – on time, – cancelled), Appleford (12.8 km south, 76.1% on time, 4.5% cancelled) and Tackley (14.3 km north, 75.8% on time, 2.2% cancelled), which are the stations on its network closest to Oxford.
Within 30 km of here, Great Western Railway runs best at Goring and Streatley, 27.5 km south (80.5%), and worst at Kingham, 29.7 km north-west (56.7%).
The busiest Great Western Railway station within 30 km of Oxford is Didcot Parkway, 15.9 km south, with about 242 scheduled stops a day.
Great Western Railway at Oxford has slipped sharply. 72.1% of stops came within three minutes of the timetable in the latest 13 periods, 5.8 percentage points worse than the 77.9% recorded in the 13 before. Cancellations rose to 4.6% of scheduled stops from 3.8%, which is 0.8 percentage points more.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,723 | 71.8% | 5.1% |
| Period 6 of 2026-27 | 3,753 | 67.7% | 4.6% |
| Period 5 of 2026-27 | 3,696 | 66.9% | 8.8% |
| Period 4 of 2026-27 | 3,620 | 64.5% | 5.5% |
| Period 3 of 2026-27 | 3,617 | 70.7% | 5.9% |
| Period 2 of 2026-27 | 3,546 | 72.1% | 3.5% |
| Period 1 of 2026-27 | 3,872 | 76.4% | 4.3% |
| Period 13 of 2025-26 | 3,679 | 81.1% | 2.3% |
| Period 12 of 2025-26 | 2,887 | 80.8% | 3.0% |
| Period 11 of 2025-26 | 3,341 | 78.9% | 3.2% |
| Period 10 of 2025-26 | 3,046 | 73.4% | 4.6% |
| Period 9 of 2025-26 | 3,307 | 65.4% | 4.6% |
| Period 8 of 2025-26 | 3,348 | 68.9% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Oxford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 26,522 | 92.5% | 1.6% |
| CrossCountry | 16,607 | 59.0% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out