Chatham
CTMSouth EastManaged by Southeastern
How this station is performing
Chatham had 91,440 scheduled stops to Period 7 of 2026-27, about 251 a day. 79.3% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Chatham opened on 25 January 1858, 168 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Strood (Kent) is the oldest (1845) and Rochester the newest (1892), with Chatham in between.
The nearest stations to Chatham are Rochester (1.4 km north-west), Gillingham (Kent) (2.2 km east), Strood (Kent) (2.3 km north-west), Cuxton (4.2 km west) and Halling (6.1 km south-west). 11 stations lie within 10 km in all. Of the five, Halling is the most punctual at 95.0% and Rochester the least at 78.3%, with Chatham on 79.3%.
Chatham is one of 2 stations named after a town called Chatham, home to about 76,792 people; this one stands 0.2 km from its centre.
2 operators call at Chatham: Southeastern (77.2%, 71% of stops) and GTR (84.5%, 29% of stops). The operator you travel with matters: GTR reaches 84.5% within three minutes while Southeastern manages 77.2%, a gap of 7.3 percentage points.
Compared with 3 stations of a similar size in South East, Chatham is the most punctual, at 79.3%. The comparison group includes Rochester (78.3%), Gillingham (Kent) (78.5%) and Havant (74.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 65,317 | 77.2% | 1.8% |
| GTR | 26,123 | 84.5% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at Chatham? Delay Repay
These operators call at Chatham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,039 | 77.2% | 2.4% |
| Period 6 of 2026-27 | 7,142 | 77.0% | 2.8% |
| Period 5 of 2026-27 | 6,816 | 74.6% | 3.1% |
| Period 4 of 2026-27 | 7,201 | 79.9% | 2.6% |
| Period 3 of 2026-27 | 6,826 | 74.8% | 3.5% |
| Period 2 of 2026-27 | 6,846 | 77.7% | 3.8% |
| Period 1 of 2026-27 | 8,101 | 86.4% | 2.0% |
| Period 13 of 2025-26 | 7,644 | 83.7% | 2.0% |
| Period 12 of 2025-26 | 7,021 | 85.4% | 1.4% |
| Period 11 of 2025-26 | 6,783 | 82.6% | 2.4% |
| Period 10 of 2025-26 | 6,092 | 80.9% | 3.5% |
| Period 9 of 2025-26 | 7,030 | 73.1% | 3.4% |
| Period 8 of 2025-26 | 6,899 | 75.2% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rochester | 92,179 | 78.3% | 2.6% |
| Gillingham (Kent) | 92,369 | 78.5% | 2.7% |
| Havant | 92,820 | 74.5% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out