Chiltern Railways at Oxford
All trains at OxfordChiltern Railways across BritainSouth East
How this operator is doing here
Chiltern Railways had 26,522 scheduled stops at Oxford in the 13 periods to Period 7 of 2026-27, 30% of the station's total. 92.5% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Chiltern Railways trains at Oxford also serve Oxford Parkway (5.6 km north, 92.5% on time, 1.4% cancelled), Islip (8.4 km north, 92.5% on time, 1.3% cancelled), Tackley (14.3 km north, – on time, – cancelled), Bicester Village (17.5 km north-east, 92.6% on time, 1.1% cancelled), Heyford (18.5 km north, – on time, – cancelled) and Bicester North (18.6 km north-east, 82.4% on time, 1.0% cancelled), which are the stations on its network closest to Oxford.
Within 30 km of here, Chiltern Railways runs best at Bicester Village, 17.5 km north-east (92.6%), and worst at Kings Sutton, 29.8 km north (80.3%).
The busiest Chiltern Railways station within 30 km of Oxford is Princes Risborough, 29.6 km east, with about 109 scheduled stops a day.
Of the 3 operators with enough records at Oxford, Chiltern Railways is the most punctual, at 92.5%.
For Chiltern Railways, Oxford is the 6th best of 51 ranked stations. Its 92.5% here is 4.8 percentage points above the 87.7% across the whole network.
Period by period
See how Chiltern Railways Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,031 | 92.1% | 1.2% |
| Period 6 of 2026-27 | 1,981 | 91.3% | 1.6% |
| Period 5 of 2026-27 | 2,020 | 89.6% | 2.8% |
| Period 4 of 2026-27 | 1,978 | 90.9% | 2.6% |
| Period 3 of 2026-27 | 1,896 | 91.5% | 2.4% |
| Period 2 of 2026-27 | 2,012 | 91.3% | 1.1% |
| Period 1 of 2026-27 | 2,338 | 93.9% | 1.0% |
| Period 13 of 2025-26 | 2,346 | 94.8% | 2.0% |
| Period 12 of 2025-26 | 2,035 | 93.9% | 0.2% |
| Period 11 of 2025-26 | 2,007 | 95.3% | 1.4% |
| Period 10 of 2025-26 | 1,857 | 92.5% | 0.9% |
| Period 9 of 2025-26 | 1,993 | 92.0% | 3.0% |
| Period 8 of 2025-26 | 2,028 | 92.5% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Oxford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 45,435 | 72.1% | 4.6% |
| CrossCountry | 16,607 | 59.0% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out