Dundee
DEEScotlandManaged by ScotRail
How this station is performing
Dundee had 49,538 scheduled stops to Period 7 of 2026-27, about 136 a day. 80.3% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Dundee opened on 1 June 1878, 148 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Broughty Ferry is the oldest (1838) and Balmossie the newest (1962), with Dundee in between.
The nearest stations to Dundee are Invergowrie (5.4 km west), Broughty Ferry (6.1 km east), Balmossie (8.4 km east), Monifieth (9.7 km east) and Leuchars (For St. Andrews) (10.3 km south-east). 4 stations lie within 10 km in all. At 80.3%, Dundee is more punctual than every one of them; the best of the five, Broughty Ferry, manages 76.6%.
Dundee takes its name from a big city called Dundee, home to about 148,280 people, and the station stands 0.4 km from its centre.
4 operators call at Dundee: ScotRail (81.4%, 91% of stops), LNER (67.3%, 5% of stops), CrossCountry (66.8%, 3% of stops) and Caledonian Sleeper (–, 1% of stops). The operator you travel with matters: ScotRail reaches 81.4% within three minutes while CrossCountry manages 66.8%, a gap of 14.6 percentage points.
Compared with 3 stations of a similar size in Scotland, Dundee is the least punctual, at 80.3%. All of them are ahead, including Dalreoch (86.3%), Dumbarton East (83.8%) and Croy (92.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 45,259 | 81.4% | 1.3% |
| LNER | 2,690 | 67.3% | 1.6% |
| CrossCountry | 1,301 | 66.8% | 13.5% |
| Caledonian Sleeper | 288 | – | – |
Operators with their own page for this station are linked to it.
Late train at Dundee? Delay Repay
These operators call at Dundee and publish Delay Repay rules.
- ScotRail: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Caledonian Sleeper: pays for a delay of 30 minutes or more
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,763 | 78.7% | 1.1% |
| Period 6 of 2026-27 | 3,796 | 82.3% | 1.6% |
| Period 5 of 2026-27 | 3,802 | 76.3% | 2.4% |
| Period 4 of 2026-27 | 3,798 | 81.1% | 1.3% |
| Period 3 of 2026-27 | 3,782 | 82.2% | 1.7% |
| Period 2 of 2026-27 | 3,790 | 83.5% | 1.5% |
| Period 1 of 2026-27 | 4,372 | 80.5% | 2.1% |
| Period 13 of 2025-26 | 4,112 | 81.2% | 1.1% |
| Period 12 of 2025-26 | 3,681 | 78.0% | 1.0% |
| Period 11 of 2025-26 | 3,790 | 78.6% | 2.1% |
| Period 10 of 2025-26 | 3,278 | 79.7% | 2.1% |
| Period 9 of 2025-26 | 3,787 | 80.5% | 2.3% |
| Period 8 of 2025-26 | 3,787 | 80.4% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dalreoch | 49,574 | 86.3% | 3.5% |
| Dumbarton East | 49,634 | 83.8% | 1.9% |
| Croy | 49,824 | 92.4% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out