Croy
CROScotlandManaged by ScotRail
How this station is performing
Croy had 49,824 scheduled stops to Period 7 of 2026-27, about 137 a day. 92.4% of recorded arrivals were within three minutes of the timetable and 0.8% of scheduled stops were cancelled.
Croy opened on 21 February 1842, 184 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Gartcosh is the oldest (1831) and Greenfaulds the newest (1989), with Croy in between.
The nearest stations to Croy are Greenfaulds (3.5 km south-east), Cumbernauld (3.8 km south-east), Gartcosh (8.3 km south), Lenzie (8.3 km south-west) and Stepps (9.8 km south-west). 7 stations lie within 10 km in all. At 92.4%, Croy is more punctual than every one of them; the best of the five, Stepps, manages 91.6%.
Croy is one of 2 stations named after a Village called Croy, home to about 1,570 people; this one stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Croy was Period 9 of 2024-25, at 85.7%, some time before the latest year. The strongest was Period 13 of 2024-25, at 95.5%, and the two are 9.8 percentage points apart.
Compared with 3 stations of a similar size in Scotland, Croy is the most punctual, at 92.4%. The comparison group includes Dumbarton East (83.8%), Shettleston (88.1%) and Dalreoch (86.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 49,824 | 92.4% | 0.8% |
Operators with their own page for this station are linked to it.
Late train at Croy? Delay Repay
These operators call at Croy and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,861 | 92.3% | 0.5% |
| Period 6 of 2026-27 | 3,911 | 93.5% | 0.8% |
| Period 5 of 2026-27 | 3,899 | 92.0% | 0.5% |
| Period 4 of 2026-27 | 3,389 | 92.0% | 1.9% |
| Period 3 of 2026-27 | 3,864 | 92.9% | 1.9% |
| Period 2 of 2026-27 | 3,860 | 94.6% | 0.8% |
| Period 1 of 2026-27 | 4,351 | 93.3% | 1.1% |
| Period 13 of 2025-26 | 4,242 | 94.0% | 0.9% |
| Period 12 of 2025-26 | 3,855 | 94.7% | 0.4% |
| Period 11 of 2025-26 | 3,496 | 91.9% | 0.3% |
| Period 10 of 2025-26 | 3,366 | 91.9% | 0.4% |
| Period 9 of 2025-26 | 3,868 | 88.9% | 0.7% |
| Period 8 of 2025-26 | 3,862 | 89.3% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dumbarton East | 49,634 | 83.8% | 1.9% |
| Shettleston | 50,035 | 88.1% | 2.0% |
| Dalreoch | 49,574 | 86.3% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out