LNER at Dundee
How this operator is doing here
LNER had 2,690 scheduled stops at Dundee in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 67.3% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
LNER trains at Dundee also serve Leuchars (For St. Andrews) (10.3 km south-east, 61.0% on time, 1.6% cancelled), Carnoustie (17.0 km east, – on time, – cancelled), Arbroath (26.1 km north-east, 62.4% on time, 1.8% cancelled), Perth (29.7 km west, 60.5% on time, 0.4% cancelled), Dunkeld and Birnam (38.9 km west, – on time, – cancelled) and Kirkcaldy (40.2 km south, 61.6% on time, 1.7% cancelled), which are the stations on its network closest to Dundee.
The busiest LNER station within 30 km of Dundee is Arbroath, 26.1 km north-east, with about 7 scheduled stops a day.
LNER ranks 2nd of the 3 operators with enough records at Dundee, on 67.3%.
For LNER, Dundee ranks 15th of 35 stations and is typical: 67.3% here against 67.6% across the network, a difference of 0.3 percentage points.
LNER at Dundee has slipped sharply. 67.3% of stops came within three minutes of the timetable in the latest 13 periods, 14.8 percentage points worse than the 82.1% recorded in the 13 before. Cancellations rose to 1.6% of scheduled stops from 0.7%, which is 0.9 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 208 | 66.0% | 1.0% |
| Period 6 of 2026-27 | 208 | 62.7% | 1.9% |
| Period 5 of 2026-27 | 208 | 60.5% | 1.4% |
| Period 4 of 2026-27 | 208 | 61.5% | 0.0% |
| Period 3 of 2026-27 | 208 | 62.7% | 1.9% |
| Period 2 of 2026-27 | 206 | 67.3% | 0.5% |
| Period 1 of 2026-27 | 235 | 61.2% | 1.3% |
| Period 13 of 2025-26 | 228 | 70.4% | 0.9% |
| Period 12 of 2025-26 | 194 | 65.8% | 2.1% |
| Period 11 of 2025-26 | 191 | 70.2% | 5.2% |
| Period 10 of 2025-26 | 180 | 66.1% | 1.7% |
| Period 9 of 2025-26 | 208 | 80.6% | 1.0% |
| Period 8 of 2025-26 | 208 | 79.9% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dundee
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 45,259 | 81.4% | 1.3% |
| CrossCountry | 1,301 | 66.8% | 13.5% |
| Caledonian Sleeper | 288 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out