Caledonian Sleeper delays and reliability
How this operator is doing
Caledonian Sleeper had 20,658 scheduled station stops across 53 stations in the 13 four-week periods to Period 7 of 2026-27. 76.3% of the stops with a recorded arrival came within three minutes of the timetable, and 2.3% of scheduled stops were cancelled.
The oldest stations Caledonian Sleeper calls at are Warrington Bank Quay (1832), Crewe (1837) and London Euston (1837), and the newest are Milton Keynes Central (1982), Birmingham International (1976) and Upper Tyndrum (1894).
Caledonian Sleeper's northernmost stations are Inverness and Carrbridge and its southernmost are London Euston and London Kings Cross.
The most isolated stations on the Caledonian Sleeper network are Perth (20.2 km from Dunkeld and Birnam), Dunkeld and Birnam (18.9 km from Pitlochry) and Gleneagles (17.6 km from Dunblane).
Caledonian Sleeper has slipped sharply. 76.3% of stops came within three minutes of the timetable in the latest 13 periods, 5.0 percentage points worse than the 81.3% recorded in the 13 before. Cancellations rose to 2.3% of scheduled stops from 1.6%, which is 0.7 percentage points more.
For Caledonian Sleeper, the weakest four-week period in the data is a recent one: Period 1 of 2026-27, when only 59.9% of stops arrived within three minutes of the timetable. The strongest was Period 7 of 2025-26, at 91.5%, which is 31.6 percentage points higher. Cancellations peaked at 5.2% of scheduled stops in Period 3 of 2025-26, against 2.3% over the latest 13 periods.
Delay Repay
Caledonian Sleeper pays Delay Repay for a delay of 30 minutes or more. The page sets the rules beside how often its trains run late. Read the Caledonian Sleeper Delay Repay rules
Period by period
Busiest stations
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Euston | 1,230 | 77.4% | 2.4% |
| Edinburgh | 649 | 69.9% | 2.3% |
| Inverness | 626 | – | – |
| Aviemore | 618 | – | – |
| Blair Atholl | 618 | – | – |
| Dalwhinnie | 618 | – | – |
Where it runs
| Area | Share of stops | Within 3 min | Cancelled |
|---|---|---|---|
| Scotland | 81% | 69.9% | 2.3% |
| North West | 8% | 66.1% | 0.0% |
| London | 6% | 77.4% | 2.4% |
| East of England | 3% | – | – |
| West Midlands | 2% | – | – |
| South East | 0% | – | – |
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,652 | 78.7% | 2.1% |
| Period 6 of 2026-27 | 1,650 | 74.0% | 1.0% |
| Period 5 of 2026-27 | 1,691 | 81.5% | 4.2% |
| Period 4 of 2026-27 | 1,686 | 71.0% | 3.1% |
| Period 3 of 2026-27 | 1,544 | 65.2% | 4.2% |
| Period 2 of 2026-27 | 1,667 | 70.5% | 1.0% |
| Period 1 of 2026-27 | 1,735 | 59.9% | 2.5% |
| Period 13 of 2025-26 | 1,830 | 79.0% | 1.4% |
| Period 12 of 2025-26 | 1,576 | 86.5% | 0.0% |
| Period 11 of 2025-26 | 1,321 | 73.9% | 4.2% |
| Period 10 of 2025-26 | 1,203 | 85.5% | 0.0% |
| Period 9 of 2025-26 | 1,540 | 87.2% | 2.1% |
| Period 8 of 2025-26 | 1,563 | 88.0% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out