ScotRail at Dundee
How this operator is doing here
ScotRail had 45,259 scheduled stops at Dundee in the 13 periods to Period 7 of 2026-27, 91% of the station's total. 81.4% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
ScotRail trains at Dundee also serve Invergowrie (5.4 km west, – on time, 1.7% cancelled), Broughty Ferry (6.1 km east, 76.6% on time, 2.1% cancelled), Balmossie (8.4 km east, – on time, 3.7% cancelled), Monifieth (9.7 km east, – on time, 2.2% cancelled), Leuchars (For St. Andrews) (10.3 km south-east, 76.5% on time, 1.0% cancelled) and Barry Links (14.4 km east, – on time, 3.7% cancelled), which are the stations on its network closest to Dundee.
Within 30 km of here, ScotRail runs best at Perth, 29.7 km west (83.5%), and worst at Carnoustie, 17.0 km east (68.9%).
The busiest ScotRail station within 30 km of Dundee is Perth, 29.7 km west, with about 115 scheduled stops a day.
Of the 3 operators with enough records at Dundee, ScotRail is the most punctual, at 81.4%.
For ScotRail, Dundee is the 259th best of 312 ranked stations. Its 81.4% here is 6.5 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Dundee has improved each time, from 77.9% within three minutes in 2023-24 to 79.0% in 2024-25 and 82.3% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,456 | 79.7% | 1.0% |
| Period 6 of 2026-27 | 3,458 | 83.9% | 1.2% |
| Period 5 of 2026-27 | 3,462 | 77.7% | 2.3% |
| Period 4 of 2026-27 | 3,458 | 82.6% | 1.1% |
| Period 3 of 2026-27 | 3,457 | 83.6% | 1.2% |
| Period 2 of 2026-27 | 3,454 | 84.6% | 0.9% |
| Period 1 of 2026-27 | 3,996 | 81.8% | 1.4% |
| Period 13 of 2025-26 | 3,743 | 82.6% | 0.9% |
| Period 12 of 2025-26 | 3,367 | 79.3% | 0.7% |
| Period 11 of 2025-26 | 3,515 | 79.3% | 1.5% |
| Period 10 of 2025-26 | 2,991 | 80.7% | 1.6% |
| Period 9 of 2025-26 | 3,451 | 81.0% | 2.2% |
| Period 8 of 2025-26 | 3,451 | 81.0% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dundee
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 2,690 | 67.3% | 1.6% |
| CrossCountry | 1,301 | 66.8% | 13.5% |
| Caledonian Sleeper | 288 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out