Dalreoch
DLRScotlandManaged by ScotRail
How this station is performing
Dalreoch had 49,574 scheduled stops to Period 7 of 2026-27, about 136 a day. 86.3% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
The nearest stations to Dalreoch are Dumbarton Central (0.6 km east), Dumbarton East (1.6 km east), Langbank (2.6 km south), Renton (2.6 km north) and Alexandria (4.2 km north). 15 stations lie within 10 km in all. Of the five, Langbank is the most punctual at 96.1% and Dumbarton Central the least at 82.2%, with Dalreoch on 86.3%.
Dalreoch takes its name from a suburb called Dalreoch, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Dalreoch was Period 8 of 2024-25, at 70.9%, some time before the latest year. The strongest was Period 4 of 2023-24, at 91.9%, and the two are 21.0 percentage points apart. Cancellations peaked at 7.5% of scheduled stops in Period 8 of 2024-25, against 3.5% over the latest 13 periods.
The time of year matters a great deal for Dalreoch. Averaged over every railway year in the data, period 8 (late October and November) is the weakest at 75.9%, while period 4 (July) is the strongest at 89.7%, a spread of 13.8 percentage points.
1 of 3 stations of a similar size in Scotland are more punctual than Dalreoch on 86.3%. The comparison group includes Dundee (80.3%), Dumbarton East (83.8%) and Croy (92.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 49,574 | 86.3% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Dalreoch? Delay Repay
These operators call at Dalreoch and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,817 | 84.5% | 4.5% |
| Period 6 of 2026-27 | 3,832 | 88.0% | 2.7% |
| Period 5 of 2026-27 | 3,832 | 88.7% | 3.6% |
| Period 4 of 2026-27 | 3,832 | 88.9% | 3.9% |
| Period 3 of 2026-27 | 3,832 | 90.1% | 1.8% |
| Period 2 of 2026-27 | 3,832 | 86.9% | 2.3% |
| Period 1 of 2026-27 | 4,386 | 88.8% | 2.1% |
| Period 13 of 2025-26 | 4,234 | 87.9% | 2.4% |
| Period 12 of 2025-26 | 3,832 | 87.0% | 3.5% |
| Period 11 of 2025-26 | 3,832 | 88.1% | 2.8% |
| Period 10 of 2025-26 | 2,689 | 82.1% | 5.3% |
| Period 9 of 2025-26 | 3,812 | 79.2% | 6.1% |
| Period 8 of 2025-26 | 3,812 | 79.0% | 5.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dundee | 49,538 | 80.3% | 1.7% |
| Dumbarton East | 49,634 | 83.8% | 1.9% |
| Croy | 49,824 | 92.4% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out