CrossCountry at Dundee
How this operator is doing here
CrossCountry had 1,301 scheduled stops at Dundee in the 13 periods to Period 7 of 2026-27, 3% of the station's total. 66.8% of recorded arrivals came within three minutes and 13.5% of stops were cancelled.
CrossCountry trains at Dundee also serve Leuchars (For St. Andrews) (10.3 km south-east, 54.3% on time, 13.6% cancelled), Cupar (15.7 km south, 51.2% on time, 13.6% cancelled), Ladybank (22.3 km south-west, 49.4% on time, 13.6% cancelled), Arbroath (26.1 km north-east, 73.7% on time, 10.6% cancelled), Markinch (30.2 km south, 47.1% on time, 13.6% cancelled) and Kirkcaldy (40.2 km south, 48.0% on time, 13.6% cancelled), which are the stations on its network closest to Dundee.
The busiest CrossCountry station within 30 km of Dundee is Arbroath, 26.1 km north-east, with about 2 scheduled stops a day.
Of the 3 operators with enough records at Dundee, CrossCountry is the least punctual, at 66.8%.
CrossCountry at Dundee has slipped sharply. 66.8% of stops came within three minutes of the timetable in the latest 13 periods, 14.1 percentage points worse than the 80.9% recorded in the 13 before. Cancellations rose to 13.5% of scheduled stops from 9.4%, which is 4.1 percentage points more.
Over three full railway years CrossCountry at Dundee has got worse each time, from 76.9% within three minutes in 2023-24 to 76.4% in 2024-25 and 72.7% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 77 | 72.2% | 6.5% |
| Period 6 of 2026-27 | 107 | 68.8% | 13.1% |
| Period 5 of 2026-27 | 108 | 60.6% | 8.3% |
| Period 4 of 2026-27 | 108 | 68.0% | 10.2% |
| Period 3 of 2026-27 | 96 | 71.8% | 18.8% |
| Period 2 of 2026-27 | 106 | 75.6% | 22.6% |
| Period 1 of 2026-27 | 118 | 74.1% | 28.0% |
| Period 13 of 2025-26 | 115 | 59.0% | 8.7% |
| Period 12 of 2025-26 | 101 | 57.0% | 7.9% |
| Period 11 of 2025-26 | 72 | 69.0% | 19.4% |
| Period 10 of 2025-26 | 88 | 72.9% | 20.5% |
| Period 9 of 2025-26 | 104 | 62.5% | 7.7% |
| Period 8 of 2025-26 | 101 | 64.9% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dundee
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 45,259 | 81.4% | 1.3% |
| LNER | 2,690 | 67.3% | 1.6% |
| Caledonian Sleeper | 288 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out