Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Lumo (East Coast) at Doncaster

All trains at DoncasterLumo (East Coast) across BritainYorkshire and The Humber

On time, last 13 periods–Whole station: 73.6%
Cancelled–Whole station: 2.8%
Scheduled stops4Of 130,522 at the station

How this operator is doing here

There are not enough usable records of Lumo (East Coast) at Doncaster to report how punctual it is.

Period by period

75%80%85%90%2023-242024-252025-262026-27
This pageGreat Britain
0%2%4%2023-242024-252025-262026-27

See how Lumo (East Coast) Delay Repay works

The last 13 periods

Other operators at Doncaster

OperatorScheduled stopsWithin 3 minCancelled
Northern58,02783.2%2.8%
LNER42,06566.0%2.8%
TransPennine Express12,76967.9%2.5%
CrossCountry6,79757.1%5.7%
Hull Trains4,85764.4%0.6%
East Midlands Railway3,15488.6%2.5%
Grand Central2,84951.5%2.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out