Hull Trains at Doncaster
All trains at DoncasterHull Trains across BritainYorkshire and The Humber
How this operator is doing here
Hull Trains had 4,857 scheduled stops at Doncaster in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 64.4% of recorded arrivals came within three minutes and 0.6% of stops were cancelled.
Hull Trains trains at Doncaster also serve Retford (26.5 km south-east, 65.4% on time, 0.8% cancelled), Goole (26.9 km north-east, – on time, – cancelled), Selby (29.5 km north, 70.6% on time, 1.1% cancelled), Howden (32.7 km north-east, 62.3% on time, 1.0% cancelled), Brough (43.5 km north-east, 68.6% on time, 0.6% cancelled) and Newark Northgate (54.0 km south-east, – on time, – cancelled), which are the stations on its network closest to Doncaster.
The busiest Hull Trains station within 30 km of Doncaster is Selby, 29.5 km north, with about 13 scheduled stops a day.
Hull Trains ranks 5th of the 7 operators with enough records at Doncaster, on 64.4%.
For Hull Trains, Doncaster is the 8th best of 10 ranked stations. Its 64.4% here is 3.8 percentage points below the 68.2% across the whole network.
Over three full railway years Hull Trains at Doncaster has got worse each time, from 67.5% within three minutes in 2023-24 to 66.5% in 2024-25 and 65.7% in 2025-26.
Period by period
See how Hull Trains Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 385 | 69.1% | 0.0% |
| Period 6 of 2026-27 | 369 | 60.5% | 0.5% |
| Period 5 of 2026-27 | 373 | 61.3% | 1.6% |
| Period 4 of 2026-27 | 382 | 61.1% | 0.5% |
| Period 3 of 2026-27 | 388 | 65.2% | 0.0% |
| Period 2 of 2026-27 | 384 | 62.9% | 0.3% |
| Period 1 of 2026-27 | 434 | 71.1% | 0.2% |
| Period 13 of 2025-26 | 411 | 74.9% | 0.2% |
| Period 12 of 2025-26 | 310 | 64.7% | 0.3% |
| Period 11 of 2025-26 | 357 | 66.9% | 0.8% |
| Period 10 of 2025-26 | 337 | 62.1% | 0.6% |
| Period 9 of 2025-26 | 349 | 53.4% | 1.7% |
| Period 8 of 2025-26 | 378 | 61.0% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Doncaster
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 58,027 | 83.2% | 2.8% |
| LNER | 42,065 | 66.0% | 2.8% |
| TransPennine Express | 12,769 | 67.9% | 2.5% |
| CrossCountry | 6,797 | 57.1% | 5.7% |
| East Midlands Railway | 3,154 | 88.6% | 2.5% |
| Grand Central | 2,849 | 51.5% | 2.2% |
| Lumo (East Coast) | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out