Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Lumo (East Coast) delays and reliability

On time, last 13 periods66.7%Great Britain: 83.6%
Cancelled3.0%Great Britain: 3.2%
Stations12With records
Punctuality rankNot rankedAmong ranked operators

How this operator is doing

Lumo (East Coast) had 19,646 scheduled station stops across 12 stations in the 13 four-week periods to Period 7 of 2026-27. 66.7% of the stops with a recorded arrival came within three minutes of the timetable, and 3.0% of scheduled stops were cancelled.

The oldest stations Lumo (East Coast) calls at are York (1839), Falkirk High (1842) and Glasgow Queen Street (1842), and the newest are Stevenage (1850), Peterborough (1850) and Newcastle (1850).

Lumo (East Coast)'s northernmost stations are Falkirk High and Edinburgh and its southernmost are London Kings Cross and Stevenage.

The most isolated stations on the Lumo (East Coast) network are Alnmouth (9.5 km from Acklington), Peterborough (9.4 km from Whittlesea) and Stevenage (4.1 km from Knebworth).

Experience varies widely across the 8 ranked stations of Lumo (East Coast). The best-served tenth reach 86.4% or more, the median is 70.8% and the worst tenth manage 58.5% or less, a spread of 27.9 percentage points. 6 stations fall below 85%.

Across the whole run of data, the weakest four-week period for Lumo (East Coast) was Period 8 of 2023-24, at 46.4%, some time before the latest year. The strongest was Period 13 of 2023-24, at 78.6%, and the two are 32.2 percentage points apart. Cancellations peaked at 8.9% of scheduled stops in Period 8 of 2023-24, against 3.0% over the latest 13 periods.

Delay Repay

Lumo (East Coast) pays Delay Repay for a delay of 30 minutes or more, starting at 50% of a single ticket. The page sets the rules beside how often its trains run late. Read the Lumo (East Coast) Delay Repay rules

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 73.5%Period 2 of 2023-24: 77.3%Period 3 of 2023-24: 68.3%Period 4 of 2023-24: 74.5%Period 5 of 2023-24: 75.6%Period 6 of 2023-24: 73.6%Period 7 of 2023-24: 65.9%Period 8 of 2023-24: 46.4%Period 9 of 2023-24: 65.3%Period 10 of 2023-24: 60.9%Period 11 of 2023-24: 71.8%Period 12 of 2023-24: 77.8%Period 13 of 2023-24: 78.6%Period 1 of 2024-25: 74.8%Period 2 of 2024-25: 70.8%Period 3 of 2024-25: 72.3%Period 4 of 2024-25: 72.5%Period 5 of 2024-25: 75.4%Period 6 of 2024-25: 71.8%Period 7 of 2024-25: 71.6%Period 8 of 2024-25: 72.0%Period 9 of 2024-25: 62.4%Period 10 of 2024-25: 64.9%Period 11 of 2024-25: 69.9%Period 12 of 2024-25: 75.5%Period 13 of 2024-25: 72.2%Period 1 of 2025-26: 70.4%Period 2 of 2025-26: 70.8%Period 3 of 2025-26: 73.8%Period 4 of 2025-26: 72.7%Period 5 of 2025-26: 63.3%Period 6 of 2025-26: 74.0%Period 7 of 2025-26: 72.2%Period 8 of 2025-26: 63.6%Period 9 of 2025-26: 59.9%Period 10 of 2025-26: 67.1%Period 11 of 2025-26: 68.2%Period 12 of 2025-26: 75.5%Period 13 of 2025-26: 72.9%Period 1 of 2026-27: 67.2%Period 2 of 2026-27: 65.2%Period 3 of 2026-27: 66.4%Period 4 of 2026-27: 63.2%Period 5 of 2026-27: 63.7%Period 6 of 2026-27: 65.0%Period 7 of 2026-27: 67.1%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 1.5%Period 2 of 2023-24: 1.8%Period 3 of 2023-24: 1.5%Period 4 of 2023-24: 0.7%Period 5 of 2023-24: 1.2%Period 6 of 2023-24: 1.5%Period 7 of 2023-24: 0.5%Period 8 of 2023-24: 8.9%Period 9 of 2023-24: 2.2%Period 10 of 2023-24: 3.2%Period 11 of 2023-24: 2.9%Period 12 of 2023-24: 0.4%Period 13 of 2023-24: 1.0%Period 1 of 2024-25: 1.5%Period 2 of 2024-25: 0.0%Period 3 of 2024-25: 0.0%Period 4 of 2024-25: 1.6%Period 5 of 2024-25: 1.3%Period 6 of 2024-25: 0.0%Period 7 of 2024-25: 2.2%Period 8 of 2024-25: 2.0%Period 9 of 2024-25: 0.4%Period 10 of 2024-25: 0.0%Period 11 of 2024-25: 2.6%Period 12 of 2024-25: 1.1%Period 13 of 2024-25: 1.0%Period 1 of 2025-26: 1.6%Period 2 of 2025-26: 2.8%Period 3 of 2025-26: 0.2%Period 4 of 2025-26: 1.8%Period 5 of 2025-26: 0.9%Period 6 of 2025-26: 0.4%Period 7 of 2025-26: 2.0%Period 8 of 2025-26: 0.0%Period 9 of 2025-26: 1.9%Period 10 of 2025-26: 1.0%Period 11 of 2025-26: 2.4%Period 12 of 2025-26: 3.8%Period 13 of 2025-26: 3.9%Period 1 of 2026-27: 3.5%Period 2 of 2026-27: 5.3%Period 3 of 2026-27: 3.0%Period 4 of 2026-27: 2.9%Period 5 of 2026-27: 2.9%Period 6 of 2026-27: 3.6%Period 7 of 2026-27: 3.2%2023-242024-252025-262026-27

Least punctual stations

StationScheduled stopsWithin 3 minCancelled
Morpeth3,37257.8%1.0%
Newcastle3,96358.8%1.0%
Stevenage3,11767.0%1.3%
Edinburgh3,37268.3%2.2%
London Kings Cross3,75173.3%1.2%

Most punctual stations

StationScheduled stopsWithin 3 minCancelled
London Kings Cross3,75173.3%1.2%
Edinburgh3,37268.3%2.2%
Stevenage3,11767.0%1.3%
Newcastle3,96358.8%1.0%
Morpeth3,37257.8%1.0%

Busiest stations

StationScheduled stopsWithin 3 minCancelled
Newcastle3,96358.8%1.0%
London Kings Cross3,75173.3%1.2%
Edinburgh3,37268.3%2.2%
Morpeth3,37257.8%1.0%
Stevenage3,11767.0%1.3%
Falkirk High68787.0%17.8%

Where it runs

AreaShare of stopsWithin 3 minCancelled
North East37%58.4%1.0%
Scotland28%73.7%8.0%
London19%73.3%1.2%
East of England16%67.0%1.3%
Yorkshire and The Humber0%––

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,54167.1%3.2%
Period 6 of 2026-271,60665.0%3.6%
Period 5 of 2026-271,68763.7%2.9%
Period 4 of 2026-271,66663.2%2.9%
Period 3 of 2026-271,67766.4%3.0%
Period 2 of 2026-271,47865.2%5.3%
Period 1 of 2026-271,88767.2%3.5%
Period 13 of 2025-261,55872.9%3.9%
Period 12 of 2025-261,47175.5%3.8%
Period 11 of 2025-261,57268.2%2.4%
Period 10 of 2025-261,36367.1%1.0%
Period 9 of 2025-261,07359.9%1.9%
Period 8 of 2025-261,06763.6%0.0%

Time of year

60%70%80%90%P1: 71.0%1P2: 70.8%2P3: 69.9%3P4: 70.2%4P5: 69.1%5P6: 70.7%6P7: 69.0%7P8: 60.6%8P9: 62.6%9P10: 64.5%10P11: 69.8%11P12: 76.2%12P13: 74.5%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out