Northern at Doncaster
All trains at DoncasterNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 58,027 scheduled stops at Doncaster in the 13 periods to Period 7 of 2026-27, 44% of the station's total. 83.2% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
Northern trains at Doncaster also serve Bentley (South Yorkshire) (2.5 km north, 74.5% on time, 3.2% cancelled), Adwick (6.2 km north-west, 76.2% on time, 3.2% cancelled), Kirk Sandall (6.3 km north-east, 84.5% on time, 2.9% cancelled), Conisbrough (7.2 km south-west, 82.3% on time, 2.7% cancelled), Mexborough (10.4 km west, 81.1% on time, 2.6% cancelled) and Hatfield and Stainforth (10.7 km north-east, 83.8% on time, 2.9% cancelled), which are the stations on its network closest to Doncaster.
Within 30 km of here, Northern runs best at Thorne South, 15.2 km north-east (87.9%), and worst at South Milford, 29.9 km north (64.6%).
The busiest Northern station within 30 km of Doncaster is Sheffield, 26.6 km south-west, with about 320 scheduled stops a day.
Northern ranks 2nd of the 7 operators with enough records at Doncaster, on 83.2%.
For Northern, Doncaster is the 163rd best of 493 ranked stations. Its 83.2% here is 4.6 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Doncaster has got worse each time, from 85.4% within three minutes in 2023-24 to 85.3% in 2024-25 and 83.6% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,401 | 87.3% | 2.2% |
| Period 6 of 2026-27 | 4,393 | 84.6% | 2.4% |
| Period 5 of 2026-27 | 4,440 | 82.5% | 3.3% |
| Period 4 of 2026-27 | 4,407 | 83.5% | 5.3% |
| Period 3 of 2026-27 | 4,440 | 80.7% | 2.8% |
| Period 2 of 2026-27 | 4,419 | 82.8% | 2.3% |
| Period 1 of 2026-27 | 5,099 | 86.7% | 1.8% |
| Period 13 of 2025-26 | 4,890 | 87.7% | 1.8% |
| Period 12 of 2025-26 | 4,230 | 85.9% | 2.5% |
| Period 11 of 2025-26 | 4,438 | 82.6% | 2.5% |
| Period 10 of 2025-26 | 4,032 | 81.6% | 4.1% |
| Period 9 of 2025-26 | 4,419 | 73.7% | 3.6% |
| Period 8 of 2025-26 | 4,419 | 80.8% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Doncaster
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 42,065 | 66.0% | 2.8% |
| TransPennine Express | 12,769 | 67.9% | 2.5% |
| CrossCountry | 6,797 | 57.1% | 5.7% |
| Hull Trains | 4,857 | 64.4% | 0.6% |
| East Midlands Railway | 3,154 | 88.6% | 2.5% |
| Grand Central | 2,849 | 51.5% | 2.2% |
| Lumo (East Coast) | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out