Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Grand Central at Doncaster

All trains at DoncasterGrand Central across BritainYorkshire and The Humber

On time, last 13 periods51.5%Whole station: 73.6%
Cancelled2.2%Whole station: 2.8%
Scheduled stops2,849Of 130,522 at the station

How this operator is doing here

Grand Central had 2,849 scheduled stops at Doncaster in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 51.5% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.

Grand Central trains at Doncaster also serve Pontefract Monkhill (22.5 km north-west, 56.2% on time, 2.9% cancelled), Wakefield Kirkgate (28.9 km north-west, 60.3% on time, 2.0% cancelled), Wakefield Westgate (30.0 km north-west, – on time, – cancelled), Mirfield (40.1 km north-west, 59.1% on time, 2.3% cancelled), Brighouse (46.5 km north-west, 61.8% on time, 2.3% cancelled) and Low Moor (47.7 km north-west, 65.0% on time, 2.6% cancelled), which are the stations on its network closest to Doncaster.

The busiest Grand Central station within 30 km of Doncaster is Wakefield Kirkgate, 28.9 km north-west, with about 8 scheduled stops a day.

Of the 7 operators with enough records at Doncaster, Grand Central is the least punctual, at 51.5%.

Grand Central at Doncaster has slipped sharply. 51.5% of stops came within three minutes of the timetable in the latest 13 periods, 10.3 percentage points worse than the 61.8% recorded in the 13 before. Cancellations held steady at 2.2% of scheduled stops, against 2.4% before.

Grand Central at Doncaster has not moved in one direction over three full railway years: 54.0% within three minutes in 2023-24, 60.1% in 2024-25 and 59.5% in 2025-26.

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 72.1%Period 2 of 2023-24: 74.1%Period 3 of 2023-24: 51.8%Period 4 of 2023-24: 53.0%Period 5 of 2023-24: 54.6%Period 6 of 2023-24: 42.0%Period 7 of 2023-24: 45.7%Period 8 of 2023-24: 47.8%Period 9 of 2023-24: 41.5%Period 10 of 2023-24: 41.1%Period 11 of 2023-24: 57.1%Period 12 of 2023-24: 59.4%Period 13 of 2023-24: 62.1%Period 1 of 2024-25: 60.8%Period 2 of 2024-25: 61.6%Period 3 of 2024-25: 64.5%Period 4 of 2024-25: 58.4%Period 5 of 2024-25: 59.3%Period 6 of 2024-25: 59.0%Period 7 of 2024-25: 50.9%Period 8 of 2024-25: 55.2%Period 9 of 2024-25: 50.2%Period 10 of 2024-25: 65.4%Period 11 of 2024-25: 56.3%Period 12 of 2024-25: 66.4%Period 13 of 2024-25: 72.2%Period 1 of 2025-26: 61.2%Period 2 of 2025-26: 59.0%Period 3 of 2025-26: 63.4%Period 4 of 2025-26: 66.5%Period 5 of 2025-26: 57.5%Period 6 of 2025-26: 65.2%Period 7 of 2025-26: 62.9%Period 8 of 2025-26: 61.7%Period 9 of 2025-26: 51.2%Period 10 of 2025-26: 52.1%Period 11 of 2025-26: 53.8%Period 12 of 2025-26: 55.4%Period 13 of 2025-26: 61.5%Period 1 of 2026-27: 56.9%Period 2 of 2026-27: 46.2%Period 3 of 2026-27: 49.5%Period 4 of 2026-27: 42.1%Period 5 of 2026-27: 43.6%Period 6 of 2026-27: 45.8%Period 7 of 2026-27: 48.6%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 8.9%Period 2 of 2023-24: 8.9%Period 3 of 2023-24: 5.0%Period 4 of 2023-24: 3.8%Period 5 of 2023-24: 5.4%Period 6 of 2023-24: 9.3%Period 7 of 2023-24: 5.4%Period 8 of 2023-24: 5.4%Period 9 of 2023-24: 7.3%Period 10 of 2023-24: 2.2%Period 11 of 2023-24: 8.2%Period 12 of 2023-24: 3.4%Period 13 of 2023-24: 2.2%Period 1 of 2024-25: 1.9%Period 2 of 2024-25: 3.6%Period 3 of 2024-25: 0.9%Period 4 of 2024-25: 1.3%Period 5 of 2024-25: 1.8%Period 6 of 2024-25: 2.3%Period 7 of 2024-25: 4.1%Period 8 of 2024-25: 2.8%Period 9 of 2024-25: 3.8%Period 10 of 2024-25: 3.2%Period 11 of 2024-25: 3.0%Period 12 of 2024-25: 0.9%Period 13 of 2024-25: 1.7%Period 1 of 2025-26: 1.4%Period 2 of 2025-26: 3.3%Period 3 of 2025-26: 1.4%Period 4 of 2025-26: 1.8%Period 5 of 2025-26: 5.8%Period 6 of 2025-26: 1.9%Period 7 of 2025-26: 0.9%Period 8 of 2025-26: 1.3%Period 9 of 2025-26: 3.4%Period 10 of 2025-26: 2.0%Period 11 of 2025-26: 1.9%Period 12 of 2025-26: 2.2%Period 13 of 2025-26: 0.4%Period 1 of 2026-27: 0.8%Period 2 of 2026-27: 1.3%Period 3 of 2026-27: 1.3%Period 4 of 2026-27: 4.5%Period 5 of 2026-27: 3.1%Period 6 of 2026-27: 2.3%Period 7 of 2026-27: 5.0%2023-242024-252025-262026-27

See how Grand Central Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2722148.6%5.0%
Period 6 of 2026-2721745.8%2.3%
Period 5 of 2026-2722543.6%3.1%
Period 4 of 2026-2722442.1%4.5%
Period 3 of 2026-2722549.5%1.3%
Period 2 of 2026-2722646.2%1.3%
Period 1 of 2026-2725556.9%0.8%
Period 13 of 2025-2623261.5%0.4%
Period 12 of 2025-2617955.4%2.2%
Period 11 of 2025-2621653.8%1.9%
Period 10 of 2025-2619652.1%2.0%
Period 9 of 2025-2620851.2%3.4%
Period 8 of 2025-2622561.7%1.3%

Time of year

60%80%P1: 62.4%1P2: 59.4%2P3: 57.6%3P4: 55.3%4P5: 53.7%5P6: 53.2%6P7: 52.2%7P8: 55.0%8P9: 47.6%9P10: 52.9%10P11: 55.6%11P12: 60.8%12P13: 65.3%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Doncaster

OperatorScheduled stopsWithin 3 minCancelled
Northern58,02783.2%2.8%
LNER42,06566.0%2.8%
TransPennine Express12,76967.9%2.5%
CrossCountry6,79757.1%5.7%
Hull Trains4,85764.4%0.6%
East Midlands Railway3,15488.6%2.5%
Lumo (East Coast)4––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out