CrossCountry at Doncaster
All trains at DoncasterCrossCountry across BritainYorkshire and The Humber
How this operator is doing here
CrossCountry had 6,797 scheduled stops at Doncaster in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 57.1% of recorded arrivals came within three minutes and 5.7% of stops were cancelled.
CrossCountry trains at Doncaster also serve Sheffield (26.6 km south-west, 51.7% on time, 3.4% cancelled), Wakefield Westgate (30.0 km north-west, 53.4% on time, 4.9% cancelled), Chesterfield (36.6 km south-west, 54.2% on time, 2.6% cancelled), Leeds (40.5 km north-west, 61.3% on time, 4.8% cancelled), York (48.6 km north, 58.4% on time, 3.6% cancelled) and Nottingham (63.9 km south, 79.7% on time, 8.1% cancelled), which are the stations on its network closest to Doncaster.
The busiest CrossCountry station within 30 km of Doncaster is Sheffield, 26.6 km south-west, with about 46 scheduled stops a day.
CrossCountry ranks 6th of the 7 operators with enough records at Doncaster, on 57.1%.
CrossCountry at Doncaster has slipped sharply. 57.1% of stops came within three minutes of the timetable in the latest 13 periods, 9.1 percentage points worse than the 66.2% recorded in the 13 before. Cancellations held steady at 5.7% of scheduled stops, against 6.0% before.
Over three full railway years CrossCountry at Doncaster has got worse each time, from 72.2% within three minutes in 2023-24 to 70.6% in 2024-25 and 63.2% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 546 | 56.7% | 5.7% |
| Period 6 of 2026-27 | 532 | 54.8% | 9.4% |
| Period 5 of 2026-27 | 630 | 52.3% | 6.2% |
| Period 4 of 2026-27 | 511 | 46.3% | 5.3% |
| Period 3 of 2026-27 | 581 | 52.5% | 6.2% |
| Period 2 of 2026-27 | 443 | 51.7% | 6.5% |
| Period 1 of 2026-27 | 585 | 60.9% | 4.3% |
| Period 13 of 2025-26 | 501 | 55.6% | 4.2% |
| Period 12 of 2025-26 | 461 | 64.6% | 7.4% |
| Period 11 of 2025-26 | 792 | 68.8% | 4.0% |
| Period 10 of 2025-26 | 509 | 62.6% | 8.6% |
| Period 9 of 2025-26 | 381 | 51.2% | 3.1% |
| Period 8 of 2025-26 | 325 | 57.3% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Doncaster
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 58,027 | 83.2% | 2.8% |
| LNER | 42,065 | 66.0% | 2.8% |
| TransPennine Express | 12,769 | 67.9% | 2.5% |
| Hull Trains | 4,857 | 64.4% | 0.6% |
| East Midlands Railway | 3,154 | 88.6% | 2.5% |
| Grand Central | 2,849 | 51.5% | 2.2% |
| Lumo (East Coast) | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out