Arbroath
ARBScotlandManaged by ScotRail
How this station is performing
Arbroath had 28,051 scheduled stops to Period 7 of 2026-27, about 77 a day. 71.0% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Arbroath opened on 1 February 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Carnoustie is the oldest (1838) and Balmossie the newest (1962), with Arbroath in between.
The nearest stations to Arbroath are Carnoustie (9.7 km south-west), Golf Street (10.6 km south-west), Barry Links (12.1 km south-west), Monifieth (16.6 km south-west) and Balmossie (18.0 km south-west). 1 stations lie within 10 km in all.
Arbroath takes its name from a town called Arbroath, home to about 23,940 people, and the station stands 0.3 km from its centre.
4 operators call at Arbroath: ScotRail (71.8%, 87% of stops), LNER (62.4%, 10% of stops), CrossCountry (73.7%, 3% of stops) and Caledonian Sleeper (–, 1% of stops). The operator you travel with matters: CrossCountry reaches 73.7% within three minutes while LNER manages 62.4%, a gap of 11.3 percentage points.
Compared with 3 stations of a similar size in Scotland, Arbroath is the least punctual, at 71.0%. All of them are ahead, including Wishaw (86.8%), Carluke (86.0%) and Inverness (87.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,317 | 71.8% | 1.7% |
| LNER | 2,669 | 62.4% | 1.8% |
| CrossCountry | 781 | 73.7% | 10.6% |
| Caledonian Sleeper | 284 | – | – |
Operators with their own page for this station are linked to it.
Late train at Arbroath? Delay Repay
These operators call at Arbroath and publish Delay Repay rules.
- ScotRail: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Caledonian Sleeper: pays for a delay of 30 minutes or more
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,168 | 71.5% | 1.0% |
| Period 6 of 2026-27 | 2,189 | 77.5% | 1.2% |
| Period 5 of 2026-27 | 2,192 | 71.1% | 3.1% |
| Period 4 of 2026-27 | 2,192 | 76.3% | 1.5% |
| Period 3 of 2026-27 | 2,180 | 77.0% | 1.7% |
| Period 2 of 2026-27 | 2,184 | 77.1% | 1.7% |
| Period 1 of 2026-27 | 2,505 | 71.4% | 2.8% |
| Period 13 of 2025-26 | 2,387 | 70.3% | 1.3% |
| Period 12 of 2025-26 | 1,917 | 61.8% | 1.7% |
| Period 11 of 2025-26 | 1,976 | 64.4% | 2.4% |
| Period 10 of 2025-26 | 1,883 | 68.6% | 3.3% |
| Period 9 of 2025-26 | 2,139 | 66.6% | 2.7% |
| Period 8 of 2025-26 | 2,139 | 66.7% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out