Wishaw
WSHScotlandManaged by ScotRail
How this station is performing
Wishaw had 28,790 scheduled stops to Period 7 of 2026-27, about 79 a day. 86.8% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Wishaw opened on 1 June 1880, 146 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Cleland is the oldest (1869) and Merryton the newest (2005), with Wishaw in between.
The nearest stations to Wishaw are Shieldmuir (2.1 km west), Cleland (3.7 km north), Merryton (4.1 km south-west), Carfin (4.4 km north-west) and Airbles (4.4 km west). 15 stations lie within 10 km in all. Of the five, Airbles is the most punctual at 94.0% and Merryton the least at 81.1%, with Wishaw on 86.8%.
Wishaw is one of 2 stations named after a town called Wishaw, home to about 30,290 people; this one stands 0.5 km from its centre.
For Wishaw, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 81.0% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 95.5%, which is 14.5 percentage points higher. Cancellations peaked at 6.5% of scheduled stops in Period 10 of 2024-25, against 1.7% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than Wishaw on 86.8%. The comparison group includes Carluke (86.0%), Inverness (87.1%) and Bishopbriggs (92.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 28,790 | 86.8% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Wishaw? Delay Repay
These operators call at Wishaw and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,273 | 85.9% | 1.5% |
| Period 6 of 2026-27 | 2,288 | 88.0% | 1.3% |
| Period 5 of 2026-27 | 2,288 | 87.5% | 1.8% |
| Period 4 of 2026-27 | 2,178 | 88.3% | 1.8% |
| Period 3 of 2026-27 | 2,288 | 89.3% | 0.8% |
| Period 2 of 2026-27 | 2,191 | 88.3% | 1.4% |
| Period 1 of 2026-27 | 2,512 | 88.5% | 1.5% |
| Period 13 of 2025-26 | 1,729 | 88.9% | 1.9% |
| Period 12 of 2025-26 | 2,288 | 88.2% | 2.9% |
| Period 11 of 2025-26 | 2,288 | 88.7% | 0.9% |
| Period 10 of 2025-26 | 1,929 | 83.2% | 2.6% |
| Period 9 of 2025-26 | 2,271 | 81.0% | 2.5% |
| Period 8 of 2025-26 | 2,267 | 82.6% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Carluke | 28,792 | 86.0% | 1.6% |
| Inverness | 28,851 | 87.1% | 2.1% |
| Bishopbriggs | 29,455 | 92.1% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out