Inverness
INVScotlandManaged by ScotRail
How this station is performing
Inverness had 28,851 scheduled stops to Period 7 of 2026-27, about 79 a day. 87.1% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Inverness opened on 7 November 1855, 171 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Inverness is the oldest; the next oldest, Beauly, dates from 1862.
Inverness is remote: its nearest neighbours are Inverness Airport (11.7 km north-east), Beauly (14.7 km west), Muir of Ord (14.8 km west), Conon Bridge (15.8 km north-west) and Dingwall (17.4 km north-west). Of the five, Muir of Ord is the most punctual at 89.2% and Inverness Airport the least at 85.5%, with Inverness on 87.1%.
Inverness takes its name from a city called Inverness, home to about 47,380 people, and the station stands 0.4 km from its centre.
3 operators call at Inverness: ScotRail (87.3%, 95% of stops), LNER (79.2%, 2% of stops) and Caledonian Sleeper (–, 2% of stops). The operator you travel with matters: ScotRail reaches 87.3% within three minutes while LNER manages 79.2%, a gap of 8.1 percentage points.
1 of 3 stations of a similar size in Scotland are more punctual than Inverness on 87.1%. The comparison group includes Carluke (86.0%), Wishaw (86.8%) and Bishopbriggs (92.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 27,515 | 87.3% | 2.1% |
| LNER | 710 | 79.2% | 0.7% |
| Caledonian Sleeper | 626 | – | – |
Operators with their own page for this station are linked to it.
Late train at Inverness? Delay Repay
These operators call at Inverness and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,215 | 81.9% | 2.7% |
| Period 6 of 2026-27 | 2,214 | 91.5% | 2.1% |
| Period 5 of 2026-27 | 2,217 | 88.3% | 2.8% |
| Period 4 of 2026-27 | 2,216 | 87.4% | 1.9% |
| Period 3 of 2026-27 | 2,164 | 89.3% | 1.6% |
| Period 2 of 2026-27 | 2,230 | 90.7% | 1.1% |
| Period 1 of 2026-27 | 2,581 | 91.2% | 2.0% |
| Period 13 of 2025-26 | 2,443 | 90.2% | 1.8% |
| Period 12 of 2025-26 | 2,239 | 91.3% | 1.7% |
| Period 11 of 2025-26 | 2,103 | 82.1% | 3.6% |
| Period 10 of 2025-26 | 1,902 | 85.3% | 2.6% |
| Period 9 of 2025-26 | 2,213 | 81.9% | 2.6% |
| Period 8 of 2025-26 | 2,114 | 79.3% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Carluke | 28,792 | 86.0% | 1.6% |
| Wishaw | 28,790 | 86.8% | 1.7% |
| Bishopbriggs | 29,455 | 92.1% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out