CrossCountry at Arbroath
How this operator is doing here
CrossCountry had 781 scheduled stops at Arbroath in the 13 periods to Period 7 of 2026-27, 3% of the station's total. 73.7% of recorded arrivals came within three minutes and 10.6% of stops were cancelled.
CrossCountry trains at Arbroath also serve Montrose (18.5 km north-east, 76.3% on time, 10.9% cancelled), Dundee (26.1 km south-west, 66.8% on time, 13.5% cancelled), Leuchars (For St. Andrews) (27.8 km south-west, 54.3% on time, 13.6% cancelled), Laurencekirk (31.8 km north, – on time, – cancelled), Cupar (37.3 km south-west, 51.2% on time, 13.6% cancelled) and Ladybank (45.6 km south-west, 49.4% on time, 13.6% cancelled), which are the stations on its network closest to Arbroath.
The busiest CrossCountry station within 30 km of Arbroath is Dundee, 26.1 km south-west, with about 4 scheduled stops a day.
Of the 3 operators with enough records at Arbroath, CrossCountry is the most punctual, at 73.7%.
CrossCountry cancels more at Arbroath than elsewhere: 10.6% of scheduled stops, against 5.9% across its network and 2.0% for every operator at the station.
Alongside CrossCountry, the other operators at Arbroath are ScotRail (71.8%, 87% of stops), LNER (62.4%, 10% of stops) and Caledonian Sleeper (–, 1% of stops), so passengers here can compare several services.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 54 | – | – |
| Period 6 of 2026-27 | 75 | 78.9% | 5.3% |
| Period 5 of 2026-27 | 76 | 70.4% | 6.6% |
| Period 4 of 2026-27 | 76 | 83.1% | 6.6% |
| Period 3 of 2026-27 | 67 | 84.7% | 11.9% |
| Period 2 of 2026-27 | 72 | 80.0% | 16.7% |
| Period 1 of 2026-27 | 77 | 73.8% | 20.8% |
| Period 13 of 2025-26 | 75 | 60.9% | 8.0% |
| Period 12 of 2025-26 | 59 | 55.6% | 8.5% |
| Period 11 of 2025-26 | 48 | – | – |
| Period 10 of 2025-26 | 47 | – | – |
| Period 9 of 2025-26 | 28 | – | – |
| Period 8 of 2025-26 | 27 | – | – |
Other operators at Arbroath
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,317 | 71.8% | 1.7% |
| LNER | 2,669 | 62.4% | 1.8% |
| Caledonian Sleeper | 284 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out