ScotRail at Arbroath
How this operator is doing here
ScotRail had 24,317 scheduled stops at Arbroath in the 13 periods to Period 7 of 2026-27, 87% of the station's total. 71.8% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
ScotRail trains at Arbroath also serve Carnoustie (9.7 km south-west, 68.9% on time, 1.9% cancelled), Golf Street (10.6 km south-west, – on time, 3.7% cancelled), Barry Links (12.1 km south-west, – on time, 3.7% cancelled), Monifieth (16.6 km south-west, – on time, 2.2% cancelled), Balmossie (18.0 km south-west, – on time, 3.7% cancelled) and Montrose (18.5 km north-east, 76.1% on time, 1.8% cancelled), which are the stations on its network closest to Arbroath.
Within 30 km of here, ScotRail runs best at Dundee, 26.1 km south-west (81.4%), and worst at Carnoustie, 9.7 km south-west (68.9%).
The busiest ScotRail station within 30 km of Arbroath is Dundee, 26.1 km south-west, with about 124 scheduled stops a day.
ScotRail ranks 2nd of the 3 operators with enough records at Arbroath, on 71.8%.
For ScotRail, Arbroath is the 293rd best of 312 ranked stations. Its 71.8% here is 16.1 percentage points below the 87.9% across the whole network.
ScotRail at Arbroath has not moved in one direction over three full railway years: 69.5% within three minutes in 2023-24, 67.1% in 2024-25 and 71.4% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,884 | 72.6% | 0.8% |
| Period 6 of 2026-27 | 1,883 | 79.1% | 1.0% |
| Period 5 of 2026-27 | 1,884 | 72.5% | 3.0% |
| Period 4 of 2026-27 | 1,884 | 77.7% | 1.4% |
| Period 3 of 2026-27 | 1,884 | 78.6% | 1.3% |
| Period 2 of 2026-27 | 1,882 | 78.4% | 1.3% |
| Period 1 of 2026-27 | 2,171 | 72.7% | 2.3% |
| Period 13 of 2025-26 | 2,058 | 71.3% | 1.1% |
| Period 12 of 2025-26 | 1,663 | 62.6% | 1.4% |
| Period 11 of 2025-26 | 1,728 | 64.7% | 1.5% |
| Period 10 of 2025-26 | 1,637 | 69.6% | 2.9% |
| Period 9 of 2025-26 | 1,879 | 65.8% | 2.8% |
| Period 8 of 2025-26 | 1,880 | 65.9% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Arbroath
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 2,669 | 62.4% | 1.8% |
| CrossCountry | 781 | 73.7% | 10.6% |
| Caledonian Sleeper | 284 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out