LNER at Arbroath
How this operator is doing here
LNER had 2,669 scheduled stops at Arbroath in the 13 periods to Period 7 of 2026-27, 10% of the station's total. 62.4% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
LNER trains at Arbroath also serve Carnoustie (9.7 km south-west, – on time, – cancelled), Montrose (18.5 km north-east, 63.0% on time, 1.8% cancelled), Dundee (26.1 km south-west, 67.3% on time, 1.6% cancelled), Leuchars (For St. Andrews) (27.8 km south-west, 61.0% on time, 1.6% cancelled), Laurencekirk (31.8 km north, – on time, – cancelled) and Stonehaven (50.4 km north-east, 66.8% on time, 1.9% cancelled), which are the stations on its network closest to Arbroath.
The busiest LNER station within 30 km of Arbroath is Dundee, 26.1 km south-west, with about 7 scheduled stops a day.
Of the 3 operators with enough records at Arbroath, LNER is the least punctual, at 62.4%.
For LNER, Arbroath is the 28th best of 35 ranked stations. Its 62.4% here is 5.2 percentage points below the 67.6% across the whole network.
LNER at Arbroath has slipped sharply. 62.4% of stops came within three minutes of the timetable in the latest 13 periods, 10.1 percentage points worse than the 72.5% recorded in the 13 before. Cancellations rose to 1.8% of scheduled stops from 0.8%, which is 1.0 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 208 | 62.1% | 1.0% |
| Period 6 of 2026-27 | 208 | 60.8% | 1.9% |
| Period 5 of 2026-27 | 208 | 58.3% | 1.9% |
| Period 4 of 2026-27 | 208 | 60.1% | 0.0% |
| Period 3 of 2026-27 | 208 | 59.3% | 1.9% |
| Period 2 of 2026-27 | 206 | 64.2% | 1.0% |
| Period 1 of 2026-27 | 235 | 58.7% | 2.1% |
| Period 13 of 2025-26 | 228 | 64.9% | 0.9% |
| Period 12 of 2025-26 | 176 | 56.4% | 2.3% |
| Period 11 of 2025-26 | 188 | 62.1% | 5.9% |
| Period 10 of 2025-26 | 180 | 59.9% | 1.7% |
| Period 9 of 2025-26 | 208 | 72.3% | 1.0% |
| Period 8 of 2025-26 | 208 | 71.4% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Arbroath
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,317 | 71.8% | 1.7% |
| CrossCountry | 781 | 73.7% | 10.6% |
| Caledonian Sleeper | 284 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out