Lincoln
LCNEast MidlandsManaged by East Midlands Railway
How this station is performing
Lincoln had 50,590 scheduled stops to Period 7 of 2026-27, about 139 a day. 87.8% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Lincoln opened on 17 October 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Collingham is the oldest (1846) and Metheringham the newest (1882), with Lincoln in between.
The nearest stations to Lincoln are Hykeham (5.3 km south-west), Saxilby (9.4 km north-west), Swinderby (12.5 km south-west), Metheringham (13.9 km south-east) and Collingham (16.7 km south-west). 2 stations lie within 10 km in all. Of the five, Swinderby is the most punctual at 88.3% and Saxilby the least at 78.7%, with Lincoln on 87.8%.
Lincoln takes its name from a big city called Lincoln, home to about 97,541 people, and the station stands 2.7 km from its centre.
3 operators call at Lincoln: East Midlands Railway (88.4%, 69% of stops), Northern (85.3%, 23% of stops) and LNER (89.5%, 8% of stops). They are close together, with LNER leading on 89.5% and Northern trailing on 85.3%, a gap of 4.2 percentage points.
Compared with 3 stations of a similar size in East Midlands, Lincoln is the most punctual, at 87.8%. The comparison group includes Long Eaton (71.4%), Kettering (71.1%) and Grantham (64.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 34,711 | 88.4% | 1.8% |
| Northern | 11,676 | 85.3% | 2.6% |
| LNER | 4,203 | 89.5% | 5.9% |
Operators with their own page for this station are linked to it.
Late train at Lincoln? Delay Repay
These operators call at Lincoln and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,996 | 86.4% | 1.6% |
| Period 6 of 2026-27 | 3,991 | 85.8% | 2.0% |
| Period 5 of 2026-27 | 4,005 | 85.0% | 2.9% |
| Period 4 of 2026-27 | 4,017 | 87.5% | 3.2% |
| Period 3 of 2026-27 | 3,968 | 85.8% | 1.9% |
| Period 2 of 2026-27 | 4,031 | 87.7% | 3.2% |
| Period 1 of 2026-27 | 4,641 | 90.2% | 2.1% |
| Period 13 of 2025-26 | 4,322 | 91.1% | 2.0% |
| Period 12 of 2025-26 | 3,786 | 90.2% | 1.4% |
| Period 11 of 2025-26 | 3,957 | 90.5% | 2.5% |
| Period 10 of 2025-26 | 3,485 | 89.5% | 2.6% |
| Period 9 of 2025-26 | 3,179 | 83.4% | 3.3% |
| Period 8 of 2025-26 | 3,212 | 86.1% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Long Eaton | 49,763 | 71.4% | 3.9% |
| Kettering | 48,309 | 71.1% | 6.1% |
| Grantham | 54,257 | 64.8% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out