Inverkeithing
INKScotlandManaged by ScotRail
How this station is performing
Inverkeithing had 64,612 scheduled stops to Period 7 of 2026-27, about 178 a day. 80.3% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Inverkeithing opened on 1 November 1877. It was moved to the site it uses now on 2 June 1890. Of the 5 stations nearest to it with a known opening date, Inverkeithing is the oldest; the next oldest, Dunfermline City, dates from 1877.
The nearest stations to Inverkeithing are Dalgety Bay (1.9 km north-east), Rosyth (2.2 km north-west), North Queensferry (2.5 km south), Dunfermline City (5.1 km north-west) and Dunfermline Queen Margaret (5.3 km north). 8 stations lie within 10 km in all. Of the five, Dunfermline City is the most punctual at 87.2% and Dalgety Bay the least at 79.2%, with Inverkeithing on 80.3%.
Inverkeithing takes its name from a town called Inverkeithing, home to about 4,890 people, and the station stands 0.8 km from its centre.
4 operators call at Inverkeithing: ScotRail (81.7%, 95% of stops), LNER (55.4%, 4% of stops), CrossCountry (46.9%, 1% of stops) and Caledonian Sleeper (–, 0% of stops). The operator you travel with matters: ScotRail reaches 81.7% within three minutes while CrossCountry manages 46.9%, a gap of 34.8 percentage points.
Compared with 3 stations of a similar size in Scotland, Inverkeithing is the least punctual, at 80.3%. All of them are ahead, including Anderston (84.2%), Argyle Street (84.8%) and Bellgrove (87.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 61,249 | 81.7% | 1.4% |
| LNER | 2,626 | 55.4% | 1.6% |
| CrossCountry | 692 | 46.9% | 13.6% |
| Caledonian Sleeper | 45 | – | – |
Operators with their own page for this station are linked to it.
Late train at Inverkeithing? Delay Repay
These operators call at Inverkeithing and publish Delay Repay rules.
- ScotRail: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Caledonian Sleeper: pays for a delay of 30 minutes or more
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,490 | 76.3% | 1.1% |
| Period 6 of 2026-27 | 5,014 | 80.2% | 2.0% |
| Period 5 of 2026-27 | 5,019 | 75.4% | 1.7% |
| Period 4 of 2026-27 | 5,012 | 77.4% | 1.7% |
| Period 3 of 2026-27 | 5,003 | 82.4% | 1.5% |
| Period 2 of 2026-27 | 5,004 | 83.8% | 1.3% |
| Period 1 of 2026-27 | 5,774 | 82.9% | 1.7% |
| Period 13 of 2025-26 | 5,479 | 85.3% | 1.0% |
| Period 12 of 2025-26 | 4,990 | 82.8% | 1.2% |
| Period 11 of 2025-26 | 4,619 | 83.8% | 1.8% |
| Period 10 of 2025-26 | 4,325 | 79.2% | 1.3% |
| Period 9 of 2025-26 | 4,944 | 75.6% | 2.6% |
| Period 8 of 2025-26 | 4,939 | 77.7% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Anderston | 68,522 | 84.2% | 1.8% |
| Argyle Street | 68,541 | 84.8% | 1.6% |
| Bellgrove | 68,922 | 87.9% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out