Kirkcaldy
KDYScotlandManaged by ScotRail
How this station is performing
Kirkcaldy had 40,536 scheduled stops to Period 7 of 2026-27, about 111 a day. 78.2% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Kirkcaldy opened on 20 September 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kirkcaldy is the oldest; the next oldest, Kinghorn, dates from 1847.
The nearest stations to Kirkcaldy are Kinghorn (4.8 km south), Glenrothes with Thornton (5.8 km north), Cardenden (6.7 km north-west), Burntisland (7.4 km south-west) and Lochgelly (9.4 km west). 5 stations lie within 10 km in all. Of the five, Lochgelly is the most punctual at 85.0% and Kinghorn the least at 77.6%, with Kirkcaldy on 78.2%.
Kirkcaldy takes its name from a town called Kirkcaldy, home to about 48,108 people, and the station stands 0.1 km from its centre.
4 operators call at Kirkcaldy: ScotRail (79.8%, 92% of stops), LNER (61.6%, 6% of stops), CrossCountry (48.0%, 2% of stops) and Caledonian Sleeper (–, 0% of stops). The operator you travel with matters: ScotRail reaches 79.8% within three minutes while CrossCountry manages 48.0%, a gap of 31.8 percentage points.
Compared with 3 stations of a similar size in Scotland, Kirkcaldy is the least punctual, at 78.2%. All of them are ahead, including Bellshill (87.2%), Falkirk Grahamston (90.3%) and Perth (82.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 37,231 | 79.8% | 1.4% |
| LNER | 2,568 | 61.6% | 1.7% |
| CrossCountry | 693 | 48.0% | 13.6% |
| Caledonian Sleeper | 44 | – | – |
Operators with their own page for this station are linked to it.
Late train at Kirkcaldy? Delay Repay
These operators call at Kirkcaldy and publish Delay Repay rules.
- ScotRail: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Caledonian Sleeper: pays for a delay of 30 minutes or more
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,263 | 80.9% | 1.1% |
| Period 6 of 2026-27 | 3,183 | 77.8% | 2.0% |
| Period 5 of 2026-27 | 3,186 | 72.8% | 1.7% |
| Period 4 of 2026-27 | 3,182 | 74.1% | 2.0% |
| Period 3 of 2026-27 | 3,174 | 79.3% | 1.4% |
| Period 2 of 2026-27 | 3,176 | 80.0% | 1.4% |
| Period 1 of 2026-27 | 3,661 | 81.1% | 1.8% |
| Period 13 of 2025-26 | 3,480 | 82.3% | 0.7% |
| Period 12 of 2025-26 | 3,162 | 79.1% | 1.2% |
| Period 11 of 2025-26 | 2,795 | 81.9% | 2.3% |
| Period 10 of 2025-26 | 2,799 | 76.5% | 1.4% |
| Period 9 of 2025-26 | 3,238 | 74.5% | 2.8% |
| Period 8 of 2025-26 | 3,237 | 76.4% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bellshill | 41,761 | 87.2% | 1.6% |
| Falkirk Grahamston | 39,121 | 90.3% | 0.9% |
| Perth | 43,264 | 82.7% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out