Newton Aycliffe
NAYNorth EastManaged by Northern Trains
How this station is performing
Newton Aycliffe has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 11,247 scheduled stops, about 31 a day. In those periods 88.0% of stops arrived within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Newton Aycliffe opened on 9 January 1978, 48 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Newton Aycliffe is the newest; the oldest, Shildon, opened in 1825.
The nearest stations to Newton Aycliffe are Heighington (1.9 km south), Shildon (3.3 km north-west), Bishop Auckland (7.5 km north-west), North Road (Darlington) (9.0 km south) and Darlington (10.7 km south). 4 stations lie within 10 km in all. Of the five, North Road (Darlington) is the most punctual at 88.8% and Darlington the least at 74.7%, with Newton Aycliffe on 88.0%.
Newton Aycliffe takes its name from a new town (UK) called Newton Aycliffe, home to about 26,415 people, and the station stands 1.0 km from its centre.
1 of 3 stations of a similar size in North East are more punctual than Newton Aycliffe on 88.0%. The comparison group includes Heighington (87.4%), North Road (Darlington) (88.8%) and Shildon (86.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,247 | 88.0% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 880 | 89.8% | 0.8% |
| Period 6 of 2026-27 | 882 | 91.7% | 2.9% |
| Period 5 of 2026-27 | 880 | 82.5% | 2.5% |
| Period 4 of 2026-27 | 880 | 89.6% | 1.7% |
| Period 3 of 2026-27 | 880 | 91.2% | 0.9% |
| Period 2 of 2026-27 | 871 | 86.3% | 2.1% |
| Period 1 of 2026-27 | 1,008 | – | 1.5% |
| Period 13 of 2025-26 | 912 | 88.8% | 2.0% |
| Period 12 of 2025-26 | 880 | 90.0% | 1.6% |
| Period 11 of 2025-26 | 880 | 91.0% | 1.4% |
| Period 10 of 2025-26 | 758 | 87.6% | 5.1% |
| Period 9 of 2025-26 | 738 | 83.2% | 3.0% |
| Period 8 of 2025-26 | 798 | 82.3% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heighington | 11,247 | 87.4% | 2.1% |
| North Road (Darlington) | 11,247 | 88.8% | 2.1% |
| Shildon | 11,247 | 86.3% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out