North Road (Darlington)
NRDNorth EastManaged by Northern Trains
How this station is performing
North Road (Darlington) had 11,247 scheduled stops to Period 7 of 2026-27, about 31 a day. 88.8% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
North Road (Darlington) opened on 10 October 1825, 201 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, North Road (Darlington) is the oldest; the next oldest, Dinsdale, dates from 1825.
The nearest stations to North Road (Darlington) are Darlington (1.8 km south), Dinsdale (6.1 km south-east), Heighington (7.0 km north), Teesside Airport (8.5 km east) and Newton Aycliffe (9.0 km north). 5 stations lie within 10 km in all. At 88.8%, North Road (Darlington) is more punctual than every one of them; the best of the five, Newton Aycliffe, manages 88.0%.
Across the whole run of data, the weakest four-week period for North Road (Darlington) was Period 9 of 2024-25, at 79.1%, some time before the latest year. The strongest was Period 12 of 2023-24, at 94.1%, and the two are 15.0 percentage points apart. Cancellations peaked at 11.7% of scheduled stops in Period 7 of 2024-25, against 2.1% over the latest 13 periods.
Compared with 3 stations of a similar size in North East, North Road (Darlington) is the most punctual, at 88.8%. The comparison group includes Heighington (87.4%), Newton Aycliffe (88.0%) and Shildon (86.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,247 | 88.8% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 880 | 91.4% | 0.8% |
| Period 6 of 2026-27 | 882 | 92.1% | 2.9% |
| Period 5 of 2026-27 | 880 | 82.1% | 2.5% |
| Period 4 of 2026-27 | 880 | 89.9% | 1.7% |
| Period 3 of 2026-27 | 880 | 90.8% | 0.9% |
| Period 2 of 2026-27 | 871 | 88.3% | 2.1% |
| Period 1 of 2026-27 | 1,008 | 88.6% | 1.5% |
| Period 13 of 2025-26 | 912 | 90.5% | 2.0% |
| Period 12 of 2025-26 | 880 | 91.0% | 1.5% |
| Period 11 of 2025-26 | 880 | 91.8% | 1.4% |
| Period 10 of 2025-26 | 758 | 87.6% | 5.1% |
| Period 9 of 2025-26 | 738 | 84.5% | 3.0% |
| Period 8 of 2025-26 | 798 | 83.8% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heighington | 11,247 | 87.4% | 2.1% |
| Newton Aycliffe | 11,247 | 88.0% | 2.1% |
| Shildon | 11,247 | 86.3% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out