Durham
DHMNorth EastManaged by London North Eastern Railway
How this station is performing
Durham had 42,651 scheduled stops to Period 7 of 2026-27, about 117 a day. 69.0% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Durham opened on 1 April 1857, 169 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Shildon is the oldest (1825) and Horden the newest (1905), with Durham in between.
The nearest stations to Durham are Chester-le-Street (8.4 km north), Bishop Auckland (14.9 km south-west), Seaham (16.5 km north-east), Shildon (17.4 km south) and Horden (17.7 km east). 1 stations lie within 10 km in all. At 69.0%, Durham is less punctual than all of them; the best of the five, Bishop Auckland, manages 86.4%.
Durham is one of 2 stations named after a city called Durham, home to about 48,069 people; this one stands 1.0 km from its centre.
4 operators call at Durham: LNER (68.1%, 36% of stops), CrossCountry (64.2%, 32% of stops), TransPennine Express (73.4%, 29% of stops) and Northern (86.5%, 3% of stops). The operator you travel with matters: Northern reaches 86.5% within three minutes while CrossCountry manages 64.2%, a gap of 22.3 percentage points.
Compared with 3 stations of a similar size in North East, Durham is the least punctual, at 69.0%. All of them are ahead, including Eaglescliffe (77.4%), Redcar Central (83.4%) and MetroCentre (84.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 15,297 | 68.1% | 2.4% |
| CrossCountry | 13,475 | 64.2% | 3.8% |
| TransPennine Express | 12,553 | 73.4% | 3.3% |
| Northern | 1,326 | 86.5% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Durham? Delay Repay
These operators call at Durham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,344 | 69.3% | 2.3% |
| Period 6 of 2026-27 | 3,369 | 69.5% | 4.3% |
| Period 5 of 2026-27 | 3,369 | 65.2% | 3.1% |
| Period 4 of 2026-27 | 3,384 | 67.4% | 2.5% |
| Period 3 of 2026-27 | 3,306 | 71.5% | 3.2% |
| Period 2 of 2026-27 | 3,300 | 69.1% | 3.5% |
| Period 1 of 2026-27 | 3,851 | 67.4% | 2.6% |
| Period 13 of 2025-26 | 2,856 | 73.1% | 3.1% |
| Period 12 of 2025-26 | 3,215 | 74.3% | 2.2% |
| Period 11 of 2025-26 | 3,166 | 72.7% | 3.3% |
| Period 10 of 2025-26 | 2,981 | 68.2% | 3.9% |
| Period 9 of 2025-26 | 3,174 | 63.9% | 3.2% |
| Period 8 of 2025-26 | 3,336 | 66.5% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Eaglescliffe | 39,536 | 77.4% | 1.7% |
| Redcar Central | 34,201 | 83.4% | 5.6% |
| MetroCentre | 33,429 | 84.9% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out