MetroCentre
MCENorth EastManaged by Northern Trains
How this station is performing
MetroCentre had 33,429 scheduled stops to Period 7 of 2026-27, about 92 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
MetroCentre opened on 3 August 1987, 39 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, MetroCentre is the newest; the oldest, Blaydon, opened in 1835.
The nearest stations to MetroCentre are Dunston (1.8 km south-east), Blaydon (3.1 km west), Newcastle (3.3 km east), Manors (4.0 km east) and Heworth (6.9 km east). 6 stations lie within 10 km in all. Of the five, Dunston is the most punctual at 87.0% and Newcastle the least at 76.0%, with MetroCentre on 84.9%.
The time of year matters a great deal for MetroCentre. Averaged over every railway year in the data, period 8 (late October and November) is the weakest at 77.1%, while period 13 (March) is the strongest at 88.6%, a spread of 11.5 percentage points.
Compared with 3 stations of a similar size in North East, MetroCentre is the most punctual, at 84.9%. The comparison group includes Redcar Central (83.4%), Morpeth (73.3%) and Prudhoe (81.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 33,429 | 84.9% | 3.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,552 | 84.7% | 2.5% |
| Period 6 of 2026-27 | 2,552 | 88.9% | 3.2% |
| Period 5 of 2026-27 | 2,552 | 86.7% | 3.6% |
| Period 4 of 2026-27 | 2,552 | 85.3% | 3.1% |
| Period 3 of 2026-27 | 2,552 | 89.3% | 1.9% |
| Period 2 of 2026-27 | 2,552 | 86.9% | 3.6% |
| Period 1 of 2026-27 | 2,926 | 87.3% | 3.7% |
| Period 13 of 2025-26 | 2,815 | 86.8% | 3.2% |
| Period 12 of 2025-26 | 2,552 | 87.7% | 2.7% |
| Period 11 of 2025-26 | 2,502 | 86.5% | 4.1% |
| Period 10 of 2025-26 | 2,251 | 76.0% | 6.9% |
| Period 9 of 2025-26 | 2,536 | 76.8% | 2.8% |
| Period 8 of 2025-26 | 2,535 | 79.4% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Redcar Central | 34,201 | 83.4% | 5.6% |
| Morpeth | 29,046 | 73.3% | 2.1% |
| Prudhoe | 28,889 | 81.2% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out