Darlington
DARNorth EastManaged by London North Eastern Railway
How this station is performing
Darlington had 75,796 scheduled stops to Period 7 of 2026-27, about 208 a day. 74.7% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Darlington opened on 31 March 1841. It was moved to the site it uses now on 1 July 1887. Among the 5 stations nearest to it with a known opening date, North Road (Darlington) is the oldest (1825) and Newton Aycliffe the newest (1978), with Darlington in between.
The nearest stations to Darlington are North Road (Darlington) (1.8 km north), Dinsdale (5.2 km east), Teesside Airport (7.9 km east), Heighington (8.8 km north) and Newton Aycliffe (10.7 km north). 4 stations lie within 10 km in all. At 74.7%, Darlington is less punctual than all of them; the best of the five, North Road (Darlington), manages 88.8%.
Darlington takes its name from a town called Darlington, home to about 93,015 people, and the station stands 0.7 km from its centre.
5 operators call at Darlington: Northern (88.9%, 32% of stops), LNER (65.1%, 32% of stops), CrossCountry (66.1%, 18% of stops), TransPennine Express (74.7%, 18% of stops) and Grand Central (–, 0% of stops). The operator you travel with matters: Northern reaches 88.9% within three minutes while LNER manages 65.1%, a gap of 23.8 percentage points.
2 of 3 stations of a similar size in North East are more punctual than Darlington on 74.7%. The comparison group includes Middlesbrough (83.1%), Thornaby (79.0%) and Durham (69.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,539 | 88.9% | 1.7% |
| LNER | 24,414 | 65.1% | 1.9% |
| CrossCountry | 13,479 | 66.1% | 3.7% |
| TransPennine Express | 13,354 | 74.7% | 3.3% |
| Grand Central | 10 | – | – |
Operators with their own page for this station are linked to it.
Late train at Darlington? Delay Repay
These operators call at Darlington and publish Delay Repay rules.
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- TransPennine Express: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- Grand Central: pays for a delay of 60 minutes or more, starting at 50% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,949 | 75.4% | 1.6% |
| Period 6 of 2026-27 | 5,980 | 75.6% | 3.3% |
| Period 5 of 2026-27 | 5,976 | 72.2% | 2.5% |
| Period 4 of 2026-27 | 5,987 | 73.6% | 2.1% |
| Period 3 of 2026-27 | 5,897 | 76.9% | 2.3% |
| Period 2 of 2026-27 | 5,890 | 74.2% | 2.5% |
| Period 1 of 2026-27 | 6,859 | 72.8% | 2.0% |
| Period 13 of 2025-26 | 5,360 | 78.6% | 2.4% |
| Period 12 of 2025-26 | 5,830 | 78.9% | 1.6% |
| Period 11 of 2025-26 | 5,786 | 77.9% | 2.4% |
| Period 10 of 2025-26 | 5,225 | 73.6% | 3.8% |
| Period 9 of 2025-26 | 5,343 | 70.5% | 2.6% |
| Period 8 of 2025-26 | 5,714 | 71.2% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Middlesbrough | 61,263 | 83.1% | 3.0% |
| Thornaby | 55,831 | 79.0% | 2.0% |
| Durham | 42,651 | 69.0% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out