South Bank
SBKNorth EastManaged by Northern Trains
How this station is performing
South Bank has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 6,173 scheduled stops, about 17 a day. In those periods 94.5% of stops arrived within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
South Bank opened on 1 May 1882. It was moved to the site it uses now on 23 July 1984. Among the 5 stations nearest to it with a known opening date, Middlesbrough is the oldest (1830) and James Cook University Hospital the newest (2014), with South Bank in between.
The nearest stations to South Bank are Middlesbrough (3.8 km west), James Cook University Hospital (4.1 km south-west), Marton (4.6 km south), Gypsy Lane (5.6 km south) and Nunthorpe (6.2 km south). 12 stations lie within 10 km in all. At 94.5%, South Bank is more punctual than every one of them; the best of the five, Nunthorpe, manages 85.7%.
South Bank is one of 3 stations named after a Village called South Bank, home to about 6,548 people; this one stands 0.6 km from its centre.
Compared with 3 stations of a similar size in North East, South Bank is the most punctual, at 94.5%. The comparison group includes Heighington (87.4%), Newton Aycliffe (88.0%) and North Road (Darlington) (88.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 6,173 | 94.5% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 451 | 95.8% | 1.1% |
| Period 6 of 2026-27 | 468 | 95.0% | 4.3% |
| Period 5 of 2026-27 | 468 | 91.8% | 1.3% |
| Period 4 of 2026-27 | 468 | 94.4% | 0.9% |
| Period 3 of 2026-27 | 469 | 96.3% | 4.9% |
| Period 2 of 2026-27 | 486 | 92.8% | 1.9% |
| Period 1 of 2026-27 | 536 | – | 0.4% |
| Period 13 of 2025-26 | 435 | 93.9% | 2.3% |
| Period 12 of 2025-26 | 468 | 94.8% | 1.1% |
| Period 11 of 2025-26 | 469 | 97.3% | 1.1% |
| Period 10 of 2025-26 | 426 | 95.4% | 4.5% |
| Period 9 of 2025-26 | 514 | 91.7% | 1.4% |
| Period 8 of 2025-26 | 515 | 94.7% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heighington | 11,247 | 87.4% | 2.1% |
| Newton Aycliffe | 11,247 | 88.0% | 2.1% |
| North Road (Darlington) | 11,247 | 88.8% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out