Berwick-upon-Tweed
BWKNorth EastManaged by London North Eastern Railway
How this station is performing
Berwick-upon-Tweed had 23,681 scheduled stops to Period 7 of 2026-27, about 65 a day. 68.7% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Berwick-upon-Tweed opened on 22 June 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Berwick-upon-Tweed is the oldest; the next oldest, Reston, dates from 1846.
Berwick-upon-Tweed is remote: its nearest neighbours are Reston (14.1 km north-west), Chathill (32.6 km south-east), Dunbar (40.0 km north-west), East Linton (47.1 km north-west) and Alnmouth (48.5 km south-east). Of the five, East Linton is the most punctual at 77.3% and Alnmouth the least at 65.8%, with Berwick-upon-Tweed on 68.7%.
Berwick-upon-Tweed takes its name from a town called Berwick-upon-Tweed, home to about 12,043 people, and the station stands 0.8 km from its centre.
3 operators call at Berwick-upon-Tweed: CrossCountry (67.4%, 40% of stops), LNER (64.2%, 37% of stops) and TransPennine Express (78.1%, 24% of stops). The operator you travel with matters: TransPennine Express reaches 78.1% within three minutes while LNER manages 64.2%, a gap of 13.9 percentage points.
Compared with 3 stations of a similar size in North East, Berwick-upon-Tweed is the least punctual, at 68.7%. All of them are ahead, including Saltburn (89.2%), Sunderland (75.3%) and Allens West (88.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 9,355 | 67.4% | 3.3% |
| LNER | 8,716 | 64.2% | 1.2% |
| TransPennine Express | 5,610 | 78.1% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Berwick-upon-Tweed? Delay Repay
These operators call at Berwick-upon-Tweed and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,508 | 66.2% | 1.0% |
| Period 6 of 2026-27 | 1,756 | 68.9% | 4.1% |
| Period 5 of 2026-27 | 1,833 | 64.5% | 1.6% |
| Period 4 of 2026-27 | 1,786 | 64.4% | 2.5% |
| Period 3 of 2026-27 | 1,784 | 68.0% | 3.3% |
| Period 2 of 2026-27 | 1,794 | 70.1% | 3.1% |
| Period 1 of 2026-27 | 2,047 | 66.6% | 1.8% |
| Period 13 of 2025-26 | 1,965 | 75.1% | 1.0% |
| Period 12 of 2025-26 | 1,752 | 72.5% | 1.7% |
| Period 11 of 2025-26 | 1,797 | 72.9% | 1.8% |
| Period 10 of 2025-26 | 1,685 | 67.2% | 1.6% |
| Period 9 of 2025-26 | 2,000 | 66.6% | 2.6% |
| Period 8 of 2025-26 | 1,974 | 69.7% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Saltburn | 23,994 | 89.2% | 4.1% |
| Sunderland | 24,015 | 75.3% | 2.5% |
| Allens West | 23,161 | 88.8% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out