Chester-le-Street
CLSNorth EastManaged by Northern Trains
How this station is performing
Chester-le-Street had 13,831 scheduled stops to Period 7 of 2026-27, about 38 a day. 69.7% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Chester-le-Street opened on 1 December 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Heworth is the oldest (1839) and MetroCentre the newest (1987), with Chester-le-Street in between.
The nearest stations to Chester-le-Street are Durham (8.4 km south), Heworth (10.8 km north), Dunston (11.3 km north), MetroCentre (12.8 km north-west) and Newcastle (12.8 km north). 1 stations lie within 10 km in all. Of the five, Dunston is the most punctual at 87.0% and Durham the least at 69.0%, with Chester-le-Street on 69.7%.
Chester-le-Street takes its name from a market town called Chester-le-Street, home to about 24,227 people, and the station stands 0.8 km from its centre.
2 operators call at Chester-le-Street: TransPennine Express (67.8%, 90% of stops) and Northern (87.0%, 10% of stops). The operator you travel with matters: Northern reaches 87.0% within three minutes while TransPennine Express manages 67.8%, a gap of 19.2 percentage points.
Compared with 3 stations of a similar size in North East, Chester-le-Street is the least punctual, at 69.7%. All of them are ahead, including Dunston (87.0%), Haydon Bridge (77.5%) and Nunthorpe (85.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 12,503 | 67.8% | 3.3% |
| Northern | 1,328 | 87.0% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Chester-le-Street? Delay Repay
These operators call at Chester-le-Street and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,085 | 67.2% | 1.3% |
| Period 6 of 2026-27 | 1,073 | 71.6% | 1.6% |
| Period 5 of 2026-27 | 1,083 | 67.1% | 2.4% |
| Period 4 of 2026-27 | 1,086 | 70.2% | 2.7% |
| Period 3 of 2026-27 | 1,081 | 74.6% | 1.9% |
| Period 2 of 2026-27 | 1,086 | 71.1% | 4.1% |
| Period 1 of 2026-27 | 1,241 | 67.7% | 2.6% |
| Period 13 of 2025-26 | 903 | 71.8% | 4.0% |
| Period 12 of 2025-26 | 1,083 | 73.8% | 1.8% |
| Period 11 of 2025-26 | 1,086 | 70.6% | 5.0% |
| Period 10 of 2025-26 | 980 | 67.3% | 4.7% |
| Period 9 of 2025-26 | 987 | 64.9% | 4.5% |
| Period 8 of 2025-26 | 1,057 | 67.9% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dunston | 13,806 | 87.0% | 3.6% |
| Haydon Bridge | 13,638 | 77.5% | 3.4% |
| Nunthorpe | 13,118 | 85.7% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out