Stirling
STGScotlandManaged by ScotRail
How this station is performing
Stirling had 80,099 scheduled stops to Period 7 of 2026-27, about 220 a day. 89.4% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Stirling opened on 1 March 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Stirling is the oldest; the next oldest, Bridge of Allan, dates from 1848.
The nearest stations to Stirling are Bridge of Allan (4.4 km north), Dunblane (7.6 km north), Alloa (9.1 km east), Larbert (12.6 km south-east) and Camelon (14.5 km south-east). 3 stations lie within 10 km in all. At 89.4%, Stirling is less punctual than all of them; the best of the five, Alloa, manages 95.6%.
Stirling is one of 2 stations named after a city called Stirling, home to about 37,910 people; this one stands 0.4 km from its centre.
4 operators call at Stirling: ScotRail (90.0%, 97% of stops), Lumo (West Coast) (73.5%, 1% of stops), LNER (54.0%, 1% of stops) and Caledonian Sleeper (–, 1% of stops). The operator you travel with matters: ScotRail reaches 90.0% within three minutes while LNER manages 54.0%, a gap of 36.0 percentage points.
Compared with 3 stations of a similar size in Scotland, Stirling is the most punctual, at 89.4%. The comparison group includes Westerton (86.3%), Motherwell (80.2%) and Cambuslang (84.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 77,983 | 90.0% | 1.2% |
| Lumo (West Coast) | 797 | 73.5% | 6.6% |
| LNER | 711 | 54.0% | 0.3% |
| Caledonian Sleeper | 608 | – | – |
Operators with their own page for this station are linked to it.
Late train at Stirling? Delay Repay
These operators call at Stirling and publish Delay Repay rules.
- ScotRail: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Lumo (West Coast): pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Caledonian Sleeper: pays for a delay of 30 minutes or more
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,277 | 88.9% | 0.9% |
| Period 6 of 2026-27 | 6,227 | 90.5% | 1.7% |
| Period 5 of 2026-27 | 6,307 | 88.7% | 1.7% |
| Period 4 of 2026-27 | 6,319 | 89.2% | 1.9% |
| Period 3 of 2026-27 | 6,169 | 90.3% | 1.6% |
| Period 2 of 2026-27 | 6,110 | 92.6% | 1.2% |
| Period 1 of 2026-27 | 7,074 | 90.1% | 1.0% |
| Period 13 of 2025-26 | 6,522 | 91.1% | 1.4% |
| Period 12 of 2025-26 | 5,798 | 91.6% | 0.8% |
| Period 11 of 2025-26 | 6,101 | 86.6% | 1.1% |
| Period 10 of 2025-26 | 5,249 | 88.7% | 0.7% |
| Period 9 of 2025-26 | 5,975 | 87.7% | 1.1% |
| Period 8 of 2025-26 | 5,971 | 85.7% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Westerton | 77,290 | 86.3% | 2.1% |
| Motherwell | 84,960 | 80.2% | 2.4% |
| Cambuslang | 74,200 | 84.9% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out